My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(4) Proposal
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2009
>
03/06/09 Meeting
>
6C(4) Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 12:40:35 PM
Creation date
3/4/2009 10:42:39 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bill Schalliol <br />January 30, 2009 <br />Page 3 <br />2. Wightman Petrie will conduct site visits to familiarize itself generally with the progress <br />and quality of construction and to determine in general if the construction is <br />proceeding in accordance with the design intent and construction documents. <br />3. On the basis of its observations while at the site, Wightman Petrie will keep the City <br />of South Bend informed of the progress of construction. Wightman Petrie may <br />recommend to the City the rejection of work failing to conform to the contract <br />documents, if the case should arise. <br />4. Once the project is near completion,. the Consultant team will conduct a site visit with <br />the Owner for the purpose of preparing a "final punch list" report. When the project is <br />complete, we will conduct a final walk through with the Owner and Contractor for <br />project closeout. <br />SUMMARY OF ESTIMATED FEES <br />The services described above shall be provided on a time and expense, not to exceed basis. <br />Task 1 -Schematic Design/Design Development $ 4,250.00 <br />Task 2 -Construction Documents $13,825.00 <br />Task 3 -Bidding and Negotiation $ 1,225.00 <br />Task 4 -Construction Observation 2 200.00 <br />TOTAL ESTIMATED PROJECT FEES $21,ii00.00 <br />EXCLUSIONS: <br />The City of South. Bend shall provide the following information or services as required for <br />performance of the work. Wightman Petrie assumes no responsibility for the accuracy of such <br />information or services and shall not be liable for errors or omissions therein. Should Wightman <br />Petrie be required to provide services in obtaining or coordinating compilation of this information, <br />such services shall be considered as Additional Services. <br />1. Engineering other than that provided within the Scope of Services. <br />2. Geotechnical reports. <br />3. Environmental audits <br />4. City infrastructure records <br />5. Coordination with Burkhart Signs for billboard removal. <br />6. Division 0 and 1 (front end) specifications. <br />Be assured that all of the above services will be delivered in a continuously timely manner with the <br />timetable of the project held foremost. As you know, Wightman Petrie guarantees the best possible <br />product provided in the most efficient manner and accordingly will strive to reduce costs wherever <br />possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.