Laserfiche WebLink
21. The Internal Revenue Service Code of Principal Business Activity by which the <br />proposed project would be classified, by number and description: <br />22. The real property where the Equipment will be installed is located in the following <br />Allocation Area, if any, declared and confirmed by the South Bend Redevelopment <br />Commission: CBD <br />23. Other anticipated public financing for the project including, if any, industrial <br />revenue-bonding to be sought or already authorized, assistance through the United <br />States Department of Housing and Urban Development funds from the. City of South <br />Bend, Small Business Association Sections 503 and 504 financing through the <br />Business- Development Corporation of South Bend, Mishawaka, and St. Joseph <br />County, Indiana; or other public financial assistance, including but not limited to <br />public works improvements. We will receive 504 financing from the BDC for the build <br />out. We are also pursuing a Facade Grant from the City of South Bend this will include an <br />Architectural Assistance Grant. <br />24. Describe how and why the manufacturing equipment to be replaced or the facility in <br />which Equipment will be added is currently technologically, economically or energy <br />obsolete and how and why that obsolescence may lead to a decline in employment <br />and tax revenues: Currently the buildings at 511 E. Colfax and 210 Niles Ave. are in need of <br />repair and upgrade. The roof over 210 Niles Ave. (where the large equipment will be placed) <br />needs to be replaced. In order to utilize this portion of the facility for research purposes it <br />will require a new roof, upgraded electrical power and door and window replacement (to <br />make it more energy efficient). Internet and phone lines are also necessary. We plan on <br />power washing and painting, renovating the bathroom, reworking the facade, landscaping, <br />paving parking areas, adding security and lighting and adding utilities as needed to support <br />our research laboratory. 511 E Colfax is in need of upgrading phone and internet as well as <br />building out to provide more of an office environment, with offices, conference rooms, <br />restrooms, engineering work area and employee break room. We plan on reworking the <br />facade by adding windows and new doors, lighting, landscaping, security and paved parking <br />areas. All of these improvements are necessary to create an environment conducive to <br />successful research and development. We feel that without the appropriate tools in place it <br />will be very difficult to win Federal Contracts or hire skilled individuals from outside of the <br />area. <br />25. The new manufacturing equipment will be used in the direct production, <br />manufacture, fabrication, assembly, extraction, mining, processing, refining, or <br />(Revised 8/2/02) 5 <br />