My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-23-15 Zoning and Annexation
sbend
>
Public
>
Common Council
>
Minutes
>
Committee Meeting Minutes
>
2015
>
Zoning and Annexation
>
11-23-15 Zoning and Annexation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 1:48:11 PM
Creation date
12/3/2015 1:48:08 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Committee Mtg Minutes
City Counci - Date
11/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 /23/2015 <br /> 68-15 Sec IX: Proposal <br /> • Public Works recommends using the same format as the City of Fort Wayne. It is also very <br /> similar to Indianapolis in that type of street and type of closure are considered. <br /> • A time-based fee will provide an incentive to accelerate construction that impacts Right-of- <br /> Way. <br /> • New classification scheme will also scale inspection cost. Longer duration barricades require <br /> more inspection time and need for adaptive management. <br /> • The greater the restriction to traffic, the more review time necessary. <br /> Type Street Complete Closure Traffic Lane Restrictions Non-Traffic Restrictions <br /> Local $75/week $35/week $25/week <br /> Collector $50/day/lane $50/day/lane $35/week <br /> Arterial $75/day/lane $75/day/lane $35/week <br /> :1/23/2015 63.15 S e 9-15 21 <br /> 68-15 Sec IX: Justification <br /> Type Street Type Barricade FEE ® P1 CM an •FILE—Permit Mgr& <br /> Complete Closure $75/week $25 $38/wk $24/wk $34 Controller's Office <br /> Local Traffic Lane Restrictions $35/week $25 $38/wk $24/wk $34 .PI—Proj. Inspector <br /> Non-Traffic Restrictions $25/week $25 $38/wk $24/wk $34 <br /> .CM—Construction Mgr. <br /> Complete Closure $50/day/lane $25 $38/day S24/wk $55 $34 <br /> Collector Traffic Lane Restrictions $50/day/lane $25 $38/day $24/wk $28 $34 "ACE—Asst. City Engineer <br /> Non-Traffic Restrictions $35/week $25 $38/wk $24/wk $34 .CE—City Engineer <br /> Complete Closure $75/day/lane $25 $38/day $24/wk$110$34 <br /> Arterial Traffic Lane Restrictions $75/day/lane $25 $38/day $24/wk $55 $34 'Based on Average Cost. <br /> Non-Traffic Restrictions $35/week $25 $38/wk $24/wk $34 'Reduced to reflect the <br /> market and account for <br /> variability in effort. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.