Laserfiche WebLink
(5) Backup generator: <br /> a. 10 Kv or less 3880 40.00 <br /> b. Over 10 Kv 50.00 <br /> (6) Pool wiring and/or bonding 3989 40.00 <br /> (7) Repair, extension, and/or maintenance of wiring 38.90 40.00 <br /> (8) Reset,relocation,reconnect fees, each 3880 40.00 <br /> (9) Each reinspection fee 3990 40.00 <br /> (10) Each additional final inspection 60.00 <br /> If the exact number of circuits or horsepower is unknown at the time of the application for <br /> a permit, a permit may be taken for the minimum amount known with new permits issued <br /> as the extent of the work is known. <br /> Section VIII. Chapter 6, Article 6, Section 6-25(a) of the South Bend Municipal Code shall be <br /> amended to read as follows <br /> Sec. 6-25. - Inspections. <br /> (a) All electrical wiring and equipment installations and alterations requiring a permit shall be <br /> inspected by the Electrical Inspector. The permit holder shall notify the Electrical Inspector at <br /> least twenty-four (24) hours in advance of the time the work is ready for inspection. If the work <br /> does not pass inspection,a reinspection fee of thirty forty dollars($30.00$40.00) shall be charged <br /> for each future inspection of that stage of work. <br /> Section IX. Chapter 6,Article 7, Section 6-36.2(i) of the South Bend Municipal Code <br /> regarding heating, air conditioning and ventilating licenses shall be amended to read as follows: <br /> (i) License Fees: <br /> New 0 $125.00 <br /> Renewal 49080 125.00 <br /> Section X. Chapter 6,Article 7, Section 6-36.3 (c) of the South Bend Municipal Code <br /> regarding heating, air conditioning,ventilating, and refrigeration equipment or systems permits, shall <br /> be amended to read as follows: <br /> (c) Fees. Each application for a permit for installation of heating, ventilating, air conditioning, and <br /> refrigeration equipment or systems shall be accompanied by fees in accordance with the schedule <br /> below, with a minimum permit fee being thirty forty dollars ($30.00 840.00). When the total <br /> capacity of any system in any single installation is provided by more than one (1) unit, the sum of <br /> the capacities of each unit and the total number of such units shall determine the fee. <br /> (1) Space heaters, each 30,000 Btu input or more 3889 40.00 <br /> (2) Warm-air furnaces,unit heaters, cabinet heaters, and radiant tube heaters: ...40.00 <br /> a. Up to 300,000 Btu 30.00 <br /> b. 300,000 Btu input or morc '10.00 <br /> (3) Oil and gas conversions: ...40.00 <br />