Laserfiche WebLink
(e) All plumbing installations requiring a permit shall be inspected by the plumbing inspector three <br /> (3) times,once each for underground work,rough-in work,and final completion.A complete line <br /> test shall also be supervised by the plumbing inspector. The plumbing permit holder shall notify <br /> the plumbing inspector at least twenty-four (24) hours in advance of the time the work is ready <br /> for inspection. If the work does not pass inspection, a reinspection fee of thirty forty dollars <br /> ($30.00$40.00) shall be charged for each future inspection of that stage of work. <br /> • <br /> Section VI. Chapter 6, Article 6, Section 6-23(i) of the South Bend Municipal Code pertaining to <br /> electrical licenses shall be amended to read as follows: <br /> i) License Fees: <br /> (1) Class A: <br /> New $40000 $125.00 <br /> Renewal 100.00 125.00 <br /> (2) Class B: <br /> New and renewal $400.00 125.00 <br /> Section VII. Chapter 6,Article 6,Section 6-24 of the South Bend Municipal Code shall be amended <br /> to read as follows: <br /> Sec. 6-24. - Permits <br /> (c) Fees. Each application for a permit for installation or alteration of electrical wiring or equipment <br /> shall be accompanied by fees in accordance with the schedule below;with a minimum permit fee <br /> of thirty forty dollars($30.00$40.00): <br /> (1) Temporary service for construction: <br /> All amperage $ 7.00 <br /> (2) Switchboards and panel boards each, new and replaced: <br /> 60-amp 7.00 <br /> 100-amp 9.00 <br /> 200-amp 12.00 <br /> 400-amp 15.00 <br /> 600-amp 20.00 <br /> Over 600-amp to 2,000-amp 25.00 <br /> Over 2,000-amp 50.00 <br /> (3) Circuits(new or replaced): <br /> a. Each circuit 5.00 <br /> (4) Horsepower(machinery): <br /> a. First hp 7.00 <br /> b. Each additional hp 0.25 <br />