My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
10/13/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:52:22 PM
Creation date
10/28/2015 10:20:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 13, 2015 338 <br />UNIT PRICING, PHASE I <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />Amount <br />2 <br />Base Bid: Provide unit square <br />1 <br />Square <br />1.80 <br />N/A <br />foot) for chemical cleaning ng o of all brick <br />Feet <br />surfaces <br />3 <br />Base Bid: Provide unit cost(per square <br />1 <br />Square <br />1.65 <br />N/A <br />foot) for sealing (installation of water <br />Feet <br />r ellant) of all brick surfaces <br />4 <br />Base Bid: Provide unit cost (per lineal <br />1 <br />Lineal <br />90.00 <br />N/A <br />foot) of all out -of -plumb units restoration <br />Foot <br />at upper parapet horizontal relieving <br />angles on West, South, and Nast elevations <br />(not including Area "E' <br />5 <br />Base Bid: Provide unit cost (per lineal <br />1 <br />Lineal <br />90.00 <br />N/A <br />foot) of all out -of -plumb units restoration <br />Foot <br />at lower parapet horizontal relieving <br />angles on West, South, and East elevations <br />not including Area "E' <br />6 <br />Base Bid: Provide unit cost information for <br />1 <br />Square <br />18.00 <br />N/A <br />additional work not indicated on the <br />Feet <br />construction drawings for additional <br />maso= tudpointing <br />7 <br />Base Bid: Provide unit cost information for <br />1 <br />Lineal <br />40.00 <br />N/A <br />the additional work not indicated on the <br />Foot <br />construction drawings for additional new <br />_vertical control joints <br />$ <br />Base Bid: Provide unit cost information for <br />] <br />Square <br />210.00 <br />N/A <br />additional work not indicated on the <br />Feet <br />construction drawings for additional major <br />(more than 1/8" wide) masonry <br />crackinglreplamuent <br />ALTERNATE BID, PHASE 1 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />Amount <br />9 <br />Alternate Bid: Provide cast stone caps in <br />] <br />Lump <br />N/A <br />Deduct 3,000 <br />lieu of limestone caps at northwest comer <br />Sum <br />planter walls and museum entry walls <br />BASE BID, PHASE 2 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />Amount <br />10 <br />Furnish all labor, services, materials, <br />1 <br />Lump <br />N/A <br />36,500.00 <br />insurance and equipment for the Century <br />Sum <br />Center Masonry Restoration, Phase Two <br />BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL AMOUNT: <br />S250,925.00 <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik and carried, the above bids were <br />referred to Engineering and Century Center for review and recommendation. After reviewing <br />those bids, Mr. Michael Carey, Engineering, recommended that the Board award the contract to <br />the lowest responsive and responsible bidder C & S Masonry Restoration LLC, 3725 N. <br />Foundation Ct., Ste. AB, South Bend, IN 46628, in the amount of $139,000.00. Therefore, Ms. <br />Maradik made a motion that the recommendation be accepted and the bid be awarded and the <br />contract approved as outlined above. Mr. Relos seconded the motion, which carried. <br />OPENING OF BIDS — WASTEWATER TRF,ATMENT PLANT GRIT AND SCREENINGS <br />IMPROVEMENTS— PROJECT NO. 114-075R TILITIES WASTEWATER PAY AS YOU <br />GO CAPITAL) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.