My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
10/13/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:52:22 PM
Creation date
10/28/2015 10:20:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 13, 2015 337 <br />UNIT PRICING_. PFTA.QR r <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />2 <br />Base Bid: Provide unit cost(per aquaze foot) <br />1 <br />Square <br />1.10 <br />Amount <br />N/A <br />for chemical cleaning of all brick surfaces <br />Feet <br />3 <br />Base Bid: Provide unit cost(per squaze foot) <br />j <br />Square <br />N/A <br />for scaling (installation of water repellant) <br />Feet <br />.74 <br />of all brick surfaces <br />4 <br />Base Bid: Provide unit cost (per lineal Coot) <br />1 <br />Lineal <br />87.00 <br />N/A <br />of all out -of --plumb units restoration at <br />upper parapet horizontal relieving angles <br />Foot <br />on West, South, and East elevations (not <br />including Area "E') <br />$ <br />Base Bid: Provide unit cost (per lineal foot) <br />j <br />Lineal <br />$7.00 <br />N/A <br />of all out -of -plumb units restoration at <br />lower parapet horizontal relieving angles on <br />Foot <br />West, South, and East elevations (not <br />includln Area"E' <br />6 <br />Base Bid: Provide unit cost information for <br />1 <br />Square <br />11 222 <br />N/A <br />additional work not indicated on the <br />construction drawings for additional <br />Feet <br />mason the intro <br />7 <br />Base Bid: Provide unit cost information far <br />1 <br />Lineal <br />12.00 <br />N/A <br />the additional work not indicated on the <br />Foot <br />contraction drawings for addition,] new <br />vertical control 'oimt <br />$ <br />Base Bid: Provide unit cost information for <br />j <br />Square <br />153.00 <br />N/A <br />additional work not indicated on the <br />Feet <br />construction drawings for additional major <br />(more than 1/8" wide) masonry <br />crackin re lacement <br />ALTERNATE BID. PHASE t <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />9 <br />Ahemate Bid: Provide cast stone caps in <br />I <br />Lump <br />N/A <br />Amount <br />Deduct 5,000 <br />lieu of limestone caps at northwest comer <br />Silln <br />lanter walls and museum enirx walls <br />BASE BID, PHASE, 2 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />10 <br />Furnish all labor, services, materials, <br />insurance <br />1. <br />Lump <br />N/A <br />Amount <br />41,000.00 <br />and equipment for the Century <br />Sum <br />Center MasoM Restoration, Phase Two <br />BASE BID (PHASE 1 AND PHASE 2) PLUS ALTERNATE TOTAL A -MOUNT: <br />$139,000.00 <br />SLATILE ROOFING & SHEET METAL CO. INC. <br />1703 South Ironwood <br />South Bend, IN 46613 <br />Bid was signed by: Gerald Longerot <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />BASE BID, PHASE 1 <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />1 <br />Base Bid: Furnish all labor, services, <br />I <br />Lump <br />N/A <br />Amount <br />$217,425.00 <br />materials, insurance & equipment for <br />Slim <br />
The URL can be used to link to this page
Your browser does not support the video tag.