My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
10/13/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:52:22 PM
Creation date
10/28/2015 10:20:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 13, 2015 345 <br />MIDLAND ENGINEERING COMPANY INC. <br />52369 State Road 933 North <br />South Bend, IN 46637 <br />Quotation was submitted by Frederick J. Helmen, PIesident/CEO <br />QUOTATION: $13,725.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Relos and carried, the above Quotations <br />were referred to Wastewater, for review and recommendation. After reviewing those quotations, <br />Mr. Jacob Klosinski, Wastewater, recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, Slatile Roofing & Sheet Metal Co., Inc., 1703 S Ironwood <br />Rd., South Bend, IN 46613, in the amount of $7,812.00. Therefore, Mr. Relos made a motion <br />that the recommendation be accepted and the quotation be awarded as outlined above. Ms. <br />Maradik seconded the motion, which carried. <br />OPENING AND AWARD OF QUOTATIONS — GEYER DITCH LIFT STATION ACCESS <br />ROADWAY IMPROVEMENTS (UTILITIES WASTEWATER MAINTENANCE SERVICE <br />BUILDING) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />SELGE CONSTRUCTION CO. INC. <br />2833 S. I1'h St <br />Niles, MI 49120 <br />Quotation was submitted by Robert Kuhns, Project Engineer <br />QUOTATION: $72,410.00 <br />RIETH-RILEY CONSTRUCTION CO INC <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Todd J. Kulczar, Sales Manager <br />QUOTATION: $97,475.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Relos and carried, the above Quotations <br />were referred to Wastewater for review and recommendation. After reviewing those quotations, <br />Mr. Jacob Klosinski, Wastewater, recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, Selge Construction Co., Inc., 2833 S. III' St., Niles, <br />Michigan 49120, in the amount of $72,410.00. 'therefore, Mr. Relos made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Mueller <br />seconded the motion, which carried. <br />OPENING AND AWARD OF QUOTATIONS — EDISON ROAD LIFT STATION ACCESS <br />ROADWAY IMPROVEMENTS UTILITIES WASTEWATER MAINTENANCE SERVICE, <br />BUILDING) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />SELGE CONSTRUCTION CO. INC. <br />2833 S. 1 I'" St <br />Niles, MI 49120 <br />Quotation was submitted by Robert Kuhns, Project Engineer <br />QUOTATION: $15,659,25 <br />RIET14-RILEY CONSTRUCTION CO. INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.