Laserfiche WebLink
the department for the operation of its plant,b. <br />section 156: All house severs must be tested by sealing the sewer <br />at the outlet and by filling sewer with not less then a (5) five foot <br />head of water. <br />section 156t That hereafter all rater heaters burnish gas or other <br />combustible material installed shall be provided with a vent pipe connect. <br />61L to a flue that has a positive updraft which will remove dangerous <br />products of combustion* <br />Section 167: All gas supply valved to water heaters must be pro- <br />vided with a controlling device to prevent explosion of range or domestic <br />boilers and which will prevent a bank flow of hot water through cold water <br />supply. The said controlling devisee shall be approved by the Plumbing <br />inspector <br />Section 558: slip joints shall not be permitted on the sewer side <br />of any trap, All other joints shall be caulked, screwed, or wipe&# Sold* <br />Bring nipples, brass unions, gcIvanixed box unions with sheet lead gaskets, <br />made without other gaskets or peaking, or with long threaded unions are <br />permitted. No union shall be used under floors on waste or vent pipes* <br />Section 159: Slip joints shall not be permitted within any part of <br />the Veter supply system, <br />Section 160: That all persons doing any work within the terms of <br />this ordinance shall also abide by any rules established by the Board of <br />Public :forks regulating the Water Department, which are not in conflict <br />with this ordinance* <br />Section 161: All plumbing and house drainage shall be inspected <br />by said Inspector as follows* <br />ghen the soil waste pipe or vent steak are completed throughout the <br />building, and before any joint in such soil waste pipe or vent steaX or <br />fittings are aovered, and when all openings are made for the proper con- <br />nection of all fixtures all soil waste pisses or vent stacks shall be fill- <br />ed with water to the highest point or to the highest point above the <br />vents. This shall be the first test made by the 'Plumbing Inspector and <br />he shall be notified that thework is ready for inspection by written <br />notice filed with him by the employing plumber, <br />