My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/12/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
05/12/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:56:49 PM
Creation date
5/28/2015 11:49:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/12/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MAY 12, 2015 138 <br />OPENING OF BIDS — REMOVAL OF LEAD -BASED PAINT AT IVY TOWER PHASE II — <br />PROJECT NO. 115-030 RIVER WEST DEVELOPMENT AREA TIF <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />(EACI) ENVIRONMENTAL ASSURANCE COMPANY INC. <br />440 Hancock Street <br />Indianapolis, IN 46222 <br />Bid was signed by: Ronald Yazel <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total Amount <br />Removal, Management, and Disposal of <br />1 <br />Lead -based Paint in accordance with <br />1 <br />LSUM <br />$5.00 <br />$700,000.00 <br />Contract Documents and Specifications <br />Lead Monitoring — including all air, wipe <br />2 <br />sampling, testing, and reporting during <br />1 <br />LSUM <br />$.4258 <br />$ 59,612.00 <br />abatement and clearance. <br />TOTAL <br />$759,612.00 <br />Item <br />No. <br />Unit Pricing if Required <br />Unit <br />Add per <br />Unit Price <br />Deduct per <br />Unit Price <br />A <br />Removal, Management, and Disposal of <br />Lead -based Paint including Lead Monitoring <br />Square Feet <br />$6.25 <br />$4.00 <br />Removal, Management, and Disposal of <br />B <br />Lead -based Paint from linear components <br />Linear Feet <br />$30.00 <br />$20.00 <br />including Lead Monitoring. <br />INTERSTATE ENVIRONMENTAL, SERVICES INC. <br />337 West 806 North <br />Valparaiso, IN 46385 <br />Bid was signed by: David G. Schutkovske <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />Me <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit <br />Price <br />Total Amount <br />Removal, Management, and Disposal of <br />1 <br />Lead -based Paint in accordance with <br />1 <br />LSUM <br />$301,050.00 <br />Contract Documents and Specifications <br />Lead Monitoring — including all air, wipe <br />2 <br />sampling, testing, and reporting during <br />1 <br />LSUM <br />$1,900.00 <br />abatement and clearance. <br />TOTAL <br />$302,950.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.