My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Approving the Contract between Board of Public Works & Safety and Indepedent Concrete Pipe Corp.
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1940
>
Approving the Contract between Board of Public Works & Safety and Indepedent Concrete Pipe Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2015 4:05:45 PM
Creation date
5/18/2015 2:21:23 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
9/9/1940
Ord-Res Number
3344-40
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C O N T R A C T <br />This agreement entered into by and between the <br />City of South Bend, by and through its Board of Public V�orks <br />and Safety, hereinafter referred to as the City, and the <br />Independent Concrete Pipe Corporation, Incorporated, herein- <br />after referred to as t he Contractor, <br />VVITITESSETH: <br />Thet the Contractor hereby agrees to f urnish to the <br />City of South Bend One Hundred Forty (140) Feet, more or less, <br />of Thirty -six inch (36 ") Concrete Pipe, American Society <br />Testing Materials Standard C 76- Table 1, which pipe is to be <br />furnished tot he City on or before September 19th, 1940, and <br />is to be delivered to the North Michigan Street Sewer Project. <br />The City agrees to pay the Contractor the sum of <br />Two & 65/100 02.65) Dollars per foot for said pipe within <br />thirty days after delivery and acceptance. <br />It is further agreed that the Contractor will <br />furnish the City of South Bend Eleven Hundred Sixty (1160) <br />Feet, more or less, of Thirty-six inch (36 ") reinforced <br />Concrete Pipe, American Society Testing Materials Standard <br />C 76 - Table 2,a at a price of Two & 85/100 (w2.85) Dollars <br />per foot. Said pipe to be delivered on the North Tichigan <br />Street Sewer Project as directed by the City Engineer. <br />The Contractor agrees to deliver said pipe at the <br />rate of not less than fifty (50) feet per day, beginning on <br />23 rd '(C.EwJ <br />the -G&t4!i day of September, 1940, and continuing until the <br />entire pipe is delivered. <br />Payment is to be made by the City of South Bend <br />within thirty (30) days after delivery and acceptance. <br />It is agreed by and between the parties that all <br />pipe must meet specifications herein specified and such <br />additional specifications as are required by the City Engineer, <br />City of South Bend, and that no pipe will be accepted or paid <br />
The URL can be used to link to this page
Your browser does not support the video tag.