My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/14/2015 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
04/14/2015 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:57:44 PM
Creation date
4/28/2015 1:24:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING APRIL 14. 2015 107 <br />PELLEY EXCAVATING - AWARDER <br />1990 Progressive Drive <br />Niles, MI 49120 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Quotation was submitted by Charles Polley, Owner <br />QUOTATION: $32,807.00 <br />B & J EXCAVATION. INC. <br />1104 West Donald Street <br />South Bend, IN <br />Contractor's Nan -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Quotation was submitted by Eveline O'Neil, Owner <br />QUOTATION: $48,507.00 <br />JACKSON SERVICES <br />1674 N 750 W <br />Rochester, IN 46975 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Quotation was submitted by Beverly Jackson <br />QUOTATION: $34,250.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Relos and carried, the above Quotations were <br />referred to Engineering and Community Investment for review and recommendation. After <br />reviewing those quotations, Mr. Michael Carey, Engineering, recommended that the Board award <br />the contract to the lowest responsive and responsible bidder, Polley Excavating, in the amount of <br />$32,807.00. Therefore, Mr. Relos made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Henthom seconded the motion, which carried. <br />OPENING OF QUOTATIONS — SIX (6) MOBILE COLUMN LIFTS (CENTRAL SERVICES <br />CAPITAL) <br />Mr, Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />SEFAC, INC. <br />23 Fontana Lane, Suite 109 <br />Baltimore, MD 21237 <br />Contractor's Non -Collusion Affidavit, Non-Debarraeut Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Quotation was submitted by Allister Collings, President <br />Item Manufacturer Price <br />
The URL can be used to link to this page
Your browser does not support the video tag.