My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
04-13-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 12:27:40 PM
Creation date
4/9/2015 12:10:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center - Roof Specifications <br />Roof Section <br />Roof Type <br />Roof Specification (Firestone or approved equivalent) <br />A <br />Standard 20 Year TPO <br />firestone Spec. - Section 07 5423'I'heantoplasdc - Polylefin Roofing - TPO, <br />UltraPly Platinut TPO 0.060" Membrane System. <br />B <br />Solar Pancls(future) <br />Firestone Spec. Section 07 07 00 - Building Integrated Photovoltaic Systems <br />C <br />Standard 20 Ycar TPO <br />firestone Spec. - Section 07 5423 Thermoplastic - Polyletin hoofing - TPo, <br />UltraPly Platinum TPO 0.060" Membrane Ssstem. <br />1> <br />Ststiclaid 20 Year TPO <br />Firestone Spec. - Section 07 5423 Thermoplastic - Poly-lefin Roofing - TPO, <br />UltraPly Platinum TPO 0.060" \tcntbros Scstenr. <br />$ <br />Standard 20 Year "CPC) <br />Firestone Spec. -Section 07 .5423'lliennoplastic - Polviefin lioofing -'1Po, <br />UltraPly Platinum'l PO 0.060" Membrane Ststem. <br />I+ <br />Standard 20 Year TPO <br />Firestone Spec. - Section 07 54231licrinoplastic - Poklefin Roofing - TPO, <br />U1traPh- Platinum'1TO 0.1160" Menthrane System. <br />G <br />Green Roof .\pplication <br />firestone Spec. Section 0-1.33 .63 Vegetated Roof System, Sky .,cape <br />Lxtuosivc Vegetative Roof sstent, Firestone Building Pmducis. <br />Roof Sections: G - Green Roof <br />I. Remove existing roofing system to the deck. <br />2. Instill new R -20 Firestone Polyisocvinurare. <br />3. Install new Fully Adhered TPO roofing system in accordance to receive a Firestone Red Shield 20 <br />Near \G'arrann. <br />T. Remove existing wall and curb flashings and install new'1'PO flashings as per Firestone', <br />rcconunrndations <br />5. Remove caisting w-All copings and reuse if applicable or install new 24 ga. firestone copings. <br />Systems to be installed: <br />Reference Appendix A attached Firestone specification: <br />• Firestone Spec 0- 5423, 0.060" TPO, 211 Year W-.Irranty Fulty Adhered <br />• Lire tone Spec f) 5423,0.060-1130, 20 Year \C'arranrc, InN is Weld - Induction Welded System. <br />• firestone Spec 0v 33 63-\ Vegetative Roof System, Skyscapc semi - Intensive Vegetative Roof Ststem, <br />Firestone Building Products. <br />• f +irestnnc Seca Scct II � IC 1111 Buildutg inngr :ual PhotoNOltaic Systan <br />ECM 2: Lighting Replacement <br />Base Project - Lighting upgrades, Occtipanc.; Sensors. Vending Miners <br />• Base Project: <br />• For a Room by Room Lighting audit reference Attachment G. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.