My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
04-13-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 12:27:40 PM
Creation date
4/9/2015 12:10:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT B <br />SCOPE OF SERVICES <br />'I7»s Atrtduuent sets forth a description of existing equipment and the Energy Conservation Measures (ECAI) <br />and related equipment to be installed by AmereBco at the buildutgs, facilities, and areas set forth in. \ttachment <br />A within the Property. lustallation of the EC'\I(s) and the included equipment is subject to change if Ameresco <br />discovers unforeseen conditions at the Propertl- that render its prelinrinary analysis of the property inaccurate, <br />or significmth• affect achievement of the Guaranteed Savings. Aar changes to the installation of the 1 -01(s) and <br />the iachulcd equipment arc subject to approval of Customer, which approval shall not be uareasomabl'y withheld, <br />conditioned or delayed. <br />•the ECM,, described below are. included in the Scope of Services: <br />ITable 1 Century Center <br />ECM No. <br />Proposed Improvement <br />1 <br />lRoofing Replacement <br />2 <br />ILighting Replacement <br />3 <br />ILighting II - Upgrades <br />4 <br />HVAC System Upgrades <br />S <br />HVAC Control System Upgrades <br />6 <br />Ceiling Tile Replacement and Upgrades <br />Note: Although I (. \t 6 does not pi'odde utility• savings, it is caus;tlh' connected n> I: , 3 and I :.Af d. <br />ECM 1: Roofing Replacement <br />Roof Sections: A, 13, C, 1), 1{, F (Appendix A - Ref M -100 Drawing for Roof Section lavout llrauing) <br />1. Remove existing ballast and E.P.D.il. membrane <br />2. Remove wet insulation it, areas with existing roof damage and replace with new as to provide <br />positive drainage. Scopc does not include total replacement of roof insulation. With slope <br />valiance for positive drainage, insedation resisrutce value will van- between R -20 and R-24 <br />ntininnur. <br />3. ]nstall new 15" Fires tone polvisocvanuaae as per Firestone's recommendations for a'1'110 <br />InvisiWcld system. <br />4. Remove existing wall and curb flashiogs and install new7P0 (lashings as per Firestone <br />recommendations. <br />S. Remove existing wall copings and install new 24 ga. Firestone copings. <br />Reference Appendix A for additional details and specifications. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.