My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
04-13-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 12:27:40 PM
Creation date
4/9/2015 12:10:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• VFns provided by others. <br />• New 2 -wiy DDC electronic control valves for CI-I \N' coils (9). <br />• New 2 -wav DDC electronic control vilccs for I1\N' mils (9). <br />• Valves to be installed by mechanical <br />contractor. <br />5.9 — Cl' \'al-cs (1) Cooling Tower Modifications <br />• New DDC electronic isolation vilves for Towers (3). <br />• Valves to be installed by mechanical connector. <br />5.10 — Chiller Controls —Modular Chiller Controls <br />• Start/stop, stitus, and atom ;igtwls for new chiller. <br />• 13ACnlet integration of chiller (13ACnet communication cards by others). <br />• New hydronic temperature sensors. <br />• New DDC electronic isolation values for chiller (2). <br />• Valves to be installed by mechanical contractor. <br />• All points to be tennivated it existing chiller control panel. <br />5.11 — Humidifier (2) Gallery Humidification Control <br />• Analog control signal for new ]wmidifier. <br />• New gallerr bun» thh' sensor. <br />• I- Inmidiry high hinit sxxitch. <br />• Humidity :iirflosc proving stcitch. <br />• All points to be terminated at existing AHU control pine]. <br />ECM 6.0 — Ceiling Tile Replacement and Upgrades <br />Gmcml Improvements: <br />Secrions 13 and F- <br />1. Ceiling Tiles are to be removed in: (ref drawing Lo\eer Level B and Ii Sections) <br />Room Room No. <br />ELEVA,rm LOBBY 13118 <br />CORRIDOR <br />13121 <br />SUITE 1 <br />13122 <br />SL! IT 2 <br />B123 <br />SUITI' 3 <br />B124 <br />CORRIDOR <br />13135 <br />SUITI 4 <br />13131 <br />SUr1T 5 <br />8132 <br />SUITE 6 <br />13133 <br />SUrfli 7 <br />13134 <br />eLITE:8 <br />13136 <br />SUIT) ? 9 <br />13137 <br />SUITE 10 <br />13135 <br />sum., 11 <br />13139 <br />CORRIDOR <br />E121 <br />STAIRVESlll3LILE <br />1?122 <br />2. Note L:xisting Spline Ceiling tiles mill be removed ind replaced with ceiling grid and liv -in 2x2 tiles. <br />Locition of the new ceiling will be the same height as the old ceiling, to use existing sprinlder hrtds <br />and sensor;. <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.