My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
04-13-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 12:27:40 PM
Creation date
4/9/2015 12:10:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
4/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Reuse all existing binan. input devices. <br />• Reuse all existing start /stop and interlock relays. <br />• Control . of existing VFDs. <br />• Control of existing Calvet and dampers. <br />• Monitoring of existng smoke detectors. <br />• Existing point to point wiring to be reused. <br />o New I3ACnet communication trunk to ICJ -FS -60 supervisom controller. <br />5.4 — CWS (1) Chilled Water Control System <br />• FS -PCG DDC Controller with requited expansion modules. <br />• New controller to be installed in existing enclosure in central plant. <br />o New hvdronie temperature sensors. <br />• New chilled water pressure sensor. <br />• Reuse all existing binary input devices. <br />• Reuse all existing suet %stop and interlock relays. <br />• Control of existing VF13s. <br />o Control of existing riders. <br />o Existing point to point wiring to be reused. <br />• BACaet integration of Carrier controllers (BACnet communication cards be others). <br />• New 13ACnct communication trunk to JCI -Ft -60 supervisor• controller. <br />5.5 — I M S (1) I lot Water Control System <br />• FS -PCG DDC Controller with required expansion modules. <br />• New controller to be installed in existing enclosure in central plant. <br />• New hcdronie temperature sensors. <br />• Reuse 1111 existing hint. input de•viees. <br />• Reuse all existing srarr %stop and interlock relics. <br />• Control of existing VFDs. <br />• Controlofcxistingvalves. <br />0 15xisting point to point wiring to be lensed. <br />o BACnet integation of Boiler Staging Panel (BACnet communication cards by others). <br />o New BACnet communication hunk to ICJ -FS -60 supervisors' controller. <br />5.6 — Cool Tower (1) Cooling Tower Control Svstenn <br />• J .S -PCG DDC Controller with required expansion modules. <br />• Nco• controller to be installed in existing enclosure in mechanical room. <br />• New hvdrrnhic temperature sensors. <br />• Reuse all existing binar� input devices. <br />• Reuse all existing slut %stop and interlock relays. <br />• Control of existing \l-1)s. <br />• Control of existing valves. <br />• 1' ?xisting point to point wiring to be reused. <br />• New 13. \(,net communication trunk to 1CI -J ;`; -60 supervisor, controller <br />5.1 — \-A\' (1 S) Variable . \ir Volume Box Control and Tmnk <br />o N2 integration of existing DDC VAC box controllers <br />5.8 —AI -IU VFD (14) . \ir I landling Unit Supply Pan VI-1)', <br />o Start /stop, status. ;re(I speed control signals for fill V11)s. <br />• BACnet integration of V17Ds 03ACrlet communication cards by others). <br />• VI-Ds provided by others. <br />5.8— Punhps (1) 1Iydronic Puntpinp Modifications <br />o Start /stop, status, anal speed control signals for fan VFDs. <br />0 BACnet integration of \T7)s (13.- \(:net comnuu ication cards by others). <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.