My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
09-25-14 Redevelopment Commission Meeting
>
6B(2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 9:06:25 AM
Creation date
9/24/2014 9:06:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.0 Artwork Production Phase <br /> Based on the selected identity design,RLR will prepare detailed artwork of the identity. We will generate <br /> digital files of the identity for use in the production of finished graphics. Artwork production involves <br /> specifying,keyboarding and arranging typography for use in the identity. (Type fonts used may require use <br /> licenses—refer to expenses.)Prepare final art of the identity in black&white and color suitable for formal <br /> trademark registration by others. <br /> 3.0 Identity Documentation <br /> RLR Associates will develop an updatable Guide that presents specifications and standards for use of the <br /> newly established corporate identity. The Guide will display the official graphics,symbols and typography <br /> in the appropriate size, scale, color and finish for use on visual and marketing tools. The Guide will also <br /> illustrate approved use of the identity on select communications materials and merchandise(designed under <br /> separate agreement),i.e.,letterhead,publications,promotional products,event banners,etc. <br /> Deliverables: Conceptual Design–Provide a design rationale for discussion.Present 3-4 visual identity <br /> concepts on boards and in pdf format. <br /> Digital Artwork Files–Produce artwork in various formats(i.e., eps,jpg,png)suitable for <br /> application and reproduction.Provide a CD with high-and low-resolution digital art in <br /> various sizes for print,web and large format output. <br /> Identity Style Guide-Generate multi-page document(8 1/2"x 11")with drawings and <br /> written specifications illustrating the appropriate use of the identity.Provide the Guide in a <br /> digital format(pdf)along with one bound color laser copy. <br /> Meetings: Participate in or conduct progress meetings and presentations throughout the duration of the <br /> project. Specifically,we anticipate 1 leadership/stakeholder work session,and 2 <br /> review/presentation meetings. <br /> ACTIVITY –Site Identity&Wayfmding Signage <br /> Scope of Work-RLR will develop a system of exterior site signs that inform and direct visitors and users <br /> of Ignition Park. The sign system may include monumental and site identification signs,wayfinding& <br /> directional signs,boundary/perimeter markers,historic&landmark identification,and celebratory/event <br /> banners. We will specify finish materials,method of attachment, and messages for these sign devices. RLR <br /> will develop a campus-style program with consideration to vehicular and pedestrian access points. Our <br /> work will become the"design vocabulary"for signage--with logos,typography,color,and art elements that <br /> complement the architectural features of IP. <br /> Scope of Services-The above Scope of Work will be performed in the following customary architectural <br /> design phases.Each phase will proceed based on IP/architect input and approval. <br /> Page 2 <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.