My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 12:15:54 PM
Creation date
8/29/2014 12:15:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;I1 <br /> I <br /> C. The Engineer shall develop two (2) concept plans for the Roundabout(s) at the preferred <br /> location. Work shall include the following in refinement of previously developed work: <br /> i C <br /> 1 1. Undertake a capacity analyses and short network analysis to determine lane requirements <br /> 2. Prepare refined conceptual layout(s) and review with the Owner. <br /> 1 <br /> 3. Submit concept plans to the Owner for review and comments. <br /> 1 <br /> I4. Meet with the Owner for discussing merit of each concept and receiving comments. <br /> 5. Revise concept layout from Owner review for further Road Plan development. The <br /> selected layout revised from Owner review will be superimposed on Preliminary Plotted <br /> sheets described in Section A1.04.A to identify anticipated construction limits and land <br /> acquisition requirements. These sheets shall be submitted as a Grade Review Plan Set with <br /> probable project costs for review by the Owner and development consideration of the <br /> I selected alternative. <br /> i <br /> 1 A1.04 Road Plan Development <br /> i <br />! A. Preliminary Plotting shall be performed by the Engineer using the digital working drawing(s) <br /> completed as part of the Topographic Survey. This shall be completed in general conformance <br /> with Indiana Department of Transportation standards at appropriate scale(s). The Engineer <br /> shall complete the following items within these project limits and incorporate into the prepared <br />' C Road Plans: 1 <br /> 1. Identify the survey centerline,property lines and existing property owners. 1 <br /> 2. Develop existing survey centerline profile and cross section data. <br /> 3. Describe and identify in plan survey benchmarks. <br /> 4. Identify existing buildings and other improvements within the survey limits. <br /> 5. Describe existing features as topographic notes on the developed plan sheets. <br /> 6. Identify existing sewers and other below grade utilities based on field location(s) from plan <br /> records and field markings provided by others. <br /> 7. Reconcile and identify the survey centerline and S-lines with witness boxes from the <br /> prepared Location Control route Survey Plat. <br /> B. 30% Plan Development shall be extended by the Engineer from the completed Preliminary <br /> Plotting phase. The Engineer shall complete the following items within these project limits and <br /> incorporate into the prepared Road Plans: j <br /> C 1. Develop proposed line work <br /> t <br /> 1. <br /> Page 3 -- -_ — �,; <br /> (Exhibit A—Engineer's Services) <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 1 <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.