My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/24/2014 Board of Public Works
sbend
>
Public
>
Public Works
>
Minutes
>
2014
>
06/24/2014 Board of Public Works
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:03:44 PM
Creation date
7/8/2014 4:33:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />I: M <br />JUNE 24.2014 205 <br />Total Amount Division A <br />(Items A-01 through A-22) <br />Total w/Alternate <br />$469,289.00 <br />$458,539.00 <br />Total Amount Division D <br />(Items D-01 through D-20) <br />Total w/Alternate <br />$408,778.00 <br />$391,328.00 <br />C & E EXCAVATING INC <br />53767 CR 9 N <br />Elkhart, IN 46514 <br />Bid was signed by: Ed Bessinger, President <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was Submitted <br />Five (5%) Bid Bond was submitted <br />IC O <br />Total Amount Division C <br />(Items C-01 through C-15) <br />Total w/Alternate <br />$293,647.00 <br />$285,273.00 <br />Total Amount Division D <br />(Items D-01 through D-20) <br />Total w/Alternate <br />$423,173.00 <br />$417,800.00 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Roos and carried, the above bids were <br />referred to the Vacant and Abandoned Homes team for review and recommendation. After <br />reviewing those bids, Mr. John Engstrom, Engineering, stated they would not award this bid <br />today, they needed more time to review the numbers. <br />OPENING OF BIDS — DEMOLITION OF HAMILTON TOWING COMPANY - PROJECT <br />NO. 114-017 (AEDA TIFF <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient, Ms. Greene noted that Geyer Construction Co. <br />did not fill in the amount of their bid on the proposal sheet, or sign the proposal sheet. She noted <br />no bids have been read into the record; they submitted their bid bond with the amount indicated; <br />and the first page of their bid is filled in with the amount of their bid so there is no harm to the <br />Board or the other bidders. She allowed Mr. William Geyer, Geyer Construction Co., to fill in <br />the missing information and sign the proposal sheet. The following bids were opened and <br />publicly read: <br />GEYER CONSTRUCTION CO <br />64944 US 31 South <br />PO Box 229 <br />Lakeville, IN 46536 <br />Bid was signed by: William A. Geyer <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility <br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted. <br />Five (5%) Bid Bond was submitted <br />BASE BID: $128,900.00 <br />ENVIRONMENTAL ALLOWANCE $5,000.00 <br />Total Amount Items I and 2 *$128,900.00 <br />*Incorrect Total Submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.