Laserfiche WebLink
Proposal for Environmental Services Patriot Proposal Number P 14-0456 <br />Phase I Environmental Site Assessment June 26 2014 <br />Response, Compensation, and Liability Act, as amended (CERCLA or Superfund) <br />liability. <br />A Phase I ESA does not include any media sampling or any chemical analysis. Patriot <br />assumes no responsibility for environmental concerns, which may exist and are not <br />visually apparent during the Site inspection or available from record searches. <br />Required Information <br />The ESA process requires the environmental professional to contact the previous <br />owner, operator and /or major tenant of the Site. In addition, a key site manager or <br />persons knowledgeable of the Site (e.g. superintendent, maintenance manager, site <br />supervisor), should be available for interview during the Site reconnaissance if <br />applicable. Patriot will require names and contact information in order to reach these <br />persons by email or telephone (if known and /or available). <br />Patriot will require the completion of the attached questionnaire to the best of your <br />ability. Additionally, Patriot would prefer the current and /or previous owner(s) also <br />complete the questionnaire; however, owner participation is not required. <br />Finally, Patriot will require a locator and /or layout map showing the location of the Site <br />and the nearest crossroads. <br />Project Schedule <br />Patriot's standard turnaround time (TAT) for completion of the Phase I ESA is ten <br />business days following your authorization to proceed. Preliminary findings will be <br />verbally provided upon completion of the Site reconnaissance and regulatory agency <br />records review. Please contact the undersigned Patriot personnel if a different <br />completion date is required. <br />Project Fees <br />The ESA Scope of Work will be conducted for a fee of $2,300.00. This fee includes all <br />charges for labor, travel and expense, preparation of a final report, and project <br />management and coordination. Additional fees are applicable to reliance letters <br />prepared after report issuance. <br />Patriot Engineering and Environmental, Inc. Page 2 <br />