Laserfiche WebLink
REGULAR MEETING <br />AI r=DMATFS <br />JUNE 10, 2014 192 <br />^� ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />TOTAL AMOUNT <br />1 <br />Masonry Cleaning and Restoration <br />1 <br />LS <br />$ 22,450.00 <br />2 <br />Joint Sealant — Limestone head joints <br />1 <br />LS <br />2 <br />$ 27,300.00 <br />3 <br />Joint Sealant — Limestone joints <br />1 <br />LS <br />EA <br />$ 20,000.00 <br />4 <br />Brick Tuck Pointing <br />1 <br />LS <br />5 <br />$ 2,590.00 <br />5 <br />Repair Limestone at South Cupola <br />1 <br />LS <br />$ 2,100.00 <br />6 <br />Ornamental Copper Repair <br />I 1 <br />Allowance <br />ADD <br />$ 45,000.00 <br />Total Amount of rsase rsia plus AnerndLes <br />(Enter Sum of Base Bid plus Alternates 1 -5) $ 372,440.00 <br />urvi i rrcww <br />__1TEM <br />NO. <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT PRICE <br />Replacement of damaged wood decking substrate in <br />1 <br />kind with tongue and groove wood decking, <br />SF <br />$15.00 <br />2 <br />Replacement of ornamental copper ferns. <br />EA <br />$310.00 <br />3 <br />Replacement of ornamental copper corner ferns. <br />EA <br />$2,800.00 <br />4 <br />Restoration of existing ornamental copper ferns. <br />EA <br />$280.00 <br />5 <br />Tuck pointing brick mason <br />$7.20 <br />Remove and replace polyurethane joint sealant in <br />$12.80 <br />6 <br />limestone moints. <br />REA <br />7 <br />Replace clay the unit, field tile. <br />$35.00 <br />8 <br />Replace clay the unit, ridge ca <br />$110.00 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Roos and carried, the above bids were <br />referred to the Water Works Department for review and recommendation. <br />OPENING OF BIDS — 2014 JANITORIAL /CLEANING SUPPLIES (VARIOUS <br />DEPARTMENTS) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. Attorney Cheryl Greene noted due to the <br />number of individual items being bid on, she would only read the names of the bidders into the <br />record, and there would be a bid tab posted after review and tabulation of the bids. She added if <br />there was anyone present that would like a particular bid item read, she would read those items. <br />Nobody present requested to hear the bids and the following bids were opened and the names of <br />the bidders publicly read: <br />UNIPAK CORPORATION <br />P. O. Box 300027 <br />Brooklyn, NY 11230 <br />Bid was signed by: Brian Marcus <br />Contractor's Non- Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />CENTRAL POLY BAG CORP. <br />2400 Bedle Place <br />Linden, NJ 07036 <br />Bid was signed by: Andrew Hoffer, President <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />