Laserfiche WebLink
REGULAR MEETING <br />MIDLAND ENGINEERING COMPANY INC. <br />52369 State Road 933 North <br />South Bend, IN 46637 <br />JUNE 10,, 2014 191 <br />Bid was signed by: Frederick J. Helman, President /CEO <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5 %) Bid Bond was submitted. <br />BASE BID <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL <br />AMOUNT <br />1 <br />Clay Tile Roof System Restoration <br />1 <br />LS <br />EA <br />$ 234,000.00 <br />ALTERNATES <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />TOTAL <br />AMOUNT <br />1 <br />Masonry Cleaning and Restoration <br />1 <br />LS <br />EA <br />$ 20,150.00 <br />2 <br />Joint Sealant — Limestone head joints <br />1 <br />LS <br />5 <br />$ 24,500.00 <br />3 <br />Joint Sealant — Limestone joints <br />1 <br />LS <br />LF <br />$ 18,000.00 <br />4 <br />Brick Tuck Pointing <br />1 <br />LS <br />8 <br />$ 2,400.00 <br />5 <br />Re air Limestone at South Cupola <br />1 <br />LS <br />$ 2,000.00 <br />6 <br />Ornamental Copper Repair <br />Total Amount of sno Qid ..1.... wu.____a_ <br />1 <br />Allowance <br />$ 20,000.00 <br />' F - IRIL OL7 <br />(Enter Sum of Base Bid plus Alternates 1 -5) $ 321,050.00 <br />UNIT PRICES <br />ITEM <br />NO, <br />1 <br />DESCRIPTION <br />Replacement of damaged wood decking substrate in <br />kind with tongue and groove wood decking. <br />UNIT <br />SF <br />UNIT PRICE <br />$7.50 <br />2 <br />Replacement of ornamental copper ferns. <br />EA <br />$1,050.00 <br />3 <br />Replacement of ornamental copper corner ferns. <br />EA <br />$1,250.00 <br />4 <br />Restoration of existing ornamental co per ferns. <br />EA <br />$350.00 <br />5 <br />Tuckpolnting brick masonry. <br />LF <br />$6.60 <br />6 <br />Remove and replace polyurethane joint sealant in <br />limestone joints. <br />LF <br />$11,77 <br />7 <br />Re lace clay the unit, field tile. <br />EA <br />$7.00 <br />8 <br />Re lace clay the unit, ridge cap. <br />EA <br />$47.50 <br />DUDECK ROOFING AND SHEET METAL INC. <br />1634 S. Franklin Street <br />South Bend, Indiana 46613 <br />Bid was signed by: Catherine Dudeck <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5 %) Bid Bond was submitted. <br />BASE BID <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />Clay Tile Roof S stem Restoration <br />1 <br />LS <br />$ 298,000.00 <br />