My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/27/2014 Board of Public Works
sbend
>
Public
>
Public Works
>
Minutes
>
2014
>
05/27/2014 Board of Public Works
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:22 PM
Creation date
6/11/2014 8:09:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING MAY 27, 2014 180 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five (5%) Bid Bond was submitted. <br />BID <br />AMOUNT <br />BASE BID <br />$146,850.20 <br />ALTERNATE BID 41 <br />(ADDITIONAL SIDEWALK WORK) <br />$13,230.00 <br />ALTERNATE BID #2 <br />(PAVEMENT MARKINGS AND SIGNAGE <br />$1,886.00 <br />ALTERNATE BID #3 <br />(BUILDING SERVICE UTILITY WORK — WATER) <br />$23,575.00 <br />ALTERNATE BID #4 <br />(BUILDING SERVICE UTILITY WORK— SANITARY) <br />$16,325,00 <br />TOTAL OF ALL BIDS <br />$201,866.20 <br />Upon a motion made by Ms. Roos, seconded by Mr. Henthorn and carried, the above bids were <br />referred to Community Investment and Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — ANGELA BLVD. AND NORTHSHORE DRIVE TRAFFIC <br />LOOPS —PROJECT NO. 114-023 (MVH) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />PEMBERTON DAVIS ELECTRIC, INC. <br />916 E. McKinley Ave <br />Mishawaka, IN 46545 <br />Quotation was submitted by John A. Ferro <br />QUOTATION: $10,812,00 <br />Upon a motion made by Ms. Roos, seconded by Mr. Relos and carried, the above Quotations <br />were referred to Engineering for review and recommendation. <br />OPENING OF QUOTATIONS — FOURTEEN HUNDRED 1400 MORE OR LESS <br />UNIVERSAL/NESTABLE REFUSE CONTAINERS <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />PYRAMID EQUIPMENT <br />211 South Prairie Street <br />Rolling Prairie, IN 46371 <br />Quotation was submitted by Greg Dadlow <br />10% Bid Bond included <br />QUOTATION: $47.50 Each; <br />TOTAL: $66,500,00 <br />BEST EQUIPMENT CO. INC. <br />5550 Poindexter Dr. <br />Indianapolis, IN 46235 <br />Quotation was submitted by Maria Dahlmann. <br />10% Bid Bond not included <br />QUOTATION: $62.37 Each; <br />TOTAL: $87,318.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.