Laserfiche WebLink
REGULAR MEETING <br />MAY 13.2014 149 <br />Part E <br />Southwest Residential <br />$ 61,005.40 <br />Part F <br />Ewing Street <br />$ 118,985.35 <br />Part G <br />Johnson Street <br />$ 71,864.00 <br />Part D <br />TOTAL <br />$157,178.00 <br />SELGE CONSTRUCTION CO INC_ <br />2833 S 11TH STREET <br />NILES, MICHIGAN 49120 <br />Bid was signed by: James Boyles, Vice- President <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Hire Local First Application and Affidavit were submitted. <br />Five percent (5 %) Bid Bond was submitted. <br />ISM <br />Part A <br />Northwest Residential <br />$109,641.00 <br />Part B <br />Northeast Residential <br />$181,084.50 <br />Part C <br />Northeast Residential <br />$132,848.90 <br />Part D <br />Southeast Residential <br />$157,178.00 <br />Part E <br />Southwest Residential <br />$ 55,600.00 <br />Part F <br />Ewing Street <br />$122,789.50 <br />Part G <br />Johnson Street <br />$ 75,918.50 <br />TOTAL <br />$835,060.40 <br />Upon a motion made by Ms. Roos, seconded by Mr. Relos and carried, the above bids were <br />referred to the Street Department for review and recommendation. <br />OPEN AND AWARD BIDS — CENTURY CENTER EXHIBIT HALLS A AND B FLOOR <br />FINISH IMPROVEMENTS — PROJECT NO. 114 -016 CST. JOSEPH COUNTY <br />HOTEL /MOTEL TAX <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />GIBSON- LEWIS, LLC <br />1001 W. 11 STREET <br />MISHAWAKA, IN 46544 <br />Bid was signed by: Robert A. Lingenfelter, President <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5 %) Bid Bond was submitted. <br />Item <br />Description <br />Quantity <br />Unit <br />Total Amount <br />1 <br />Furnish all equipment, materials, services, <br />insurance, and labor for the installation of a <br />1 <br />LS <br />139,400.00 <br />new fluid- applied epoxy floor finish system <br />Total Amount <br />$139,400.00 <br />ZI LKOW KI CONSTRUCTION, INC. <br />4050 RALPH JONES DRIVE <br />SOUTH BEND, IN 46628 <br />Bid was signed by: Bill Favors, President <br />