Laserfiche WebLink
ARTICLE 1, <br />1. The Engineer agrees to make preliminary surveys, assemble <br />data, make engineering studies, and prepare a written report setting forth <br />the feeder main extensions needed, the proposed new sources of water <br />supply, and the volume of new storage required. A study shall be made <br />of the water supply requirements of the City, to determine the extent and <br />location of new well fields which will be required to serve present and <br />future needs. A study shall be made of the distribution system to deter- <br />mine the need for feeder extensions to newly developed areas, and to <br />determine the need for supplementing some of the existing mains to <br />provide more adequate circulation in the system. An analysis of the water <br />supply facilities will be made to determine the volume of storage needed, <br />and the location of such storage to best meet the requirements of the City. <br />The written report to be made under this Contract shall be pre- <br />pared to include the following areas: <br />AREA NO 1 <br />The northwest portion of the City, including the proposed German <br />Township annexation. <br />AREA NO 2 <br />The northeast portion of the City, including anticipated future <br />annexation areas, bounded by Cleveland Road on the north, Hickory <br />Road on the east and U. S. 31 on the west. <br />AREA NO. 3 <br />The southeast portion of the City, including anticipated annexation, <br />bounded by Kern Road on the south, Ironwood Road on the east and Kemble <br />Street extension on the west. <br />AREA NO. 4 <br />River Park area with special reference to increased circulation <br />and higher pressure. <br />AREA NO, 5 <br />The westerly portion of the City, including anticipated future annex- <br />ation, bounded by Pine Road on the west, Sample Street on the south, and <br />Elwood and Lincoln Way West on the north. <br />The Engineer agrees to prepare the written report as described <br />above in two parts as follows: <br />PRELIMINARY REPORT, indicating proposed feeder main locations, <br />proposed new sources of water supply, proposed water storage facilities, <br />and all other proposed facilities and improvements. This shall also include <br />recommendations on the scope of tests to be conducted by the City (under <br />separate Contract) for new sources of water, including the number and <br />location of proposed test wells, desired test pumping procedures, a <br />listing of analyses and test interpretations to be obtained under the test <br />program, and all related matters. <br />