Laserfiche WebLink
Cilu ofSoulli l3~axl, De/uu7menl of Cornnnmih~ & Ecwumri~ P!«nni~i,~ - IF;~'lT <br />A~mrnilx°r 3, ?OOHS <br />P~gr _' o~ 3 <br />additional 8 hours plus Cor editing, review with Carl, and I3nal typiu<~. ~i'e submit <br />fixed fee of X21,000.00 (Tw~cuty-one Thousand Dollars and '/,ero Cents) plus <br />reimbursable expenses billed at their cost times 1.2 (one and hvo Cenths). <br />A. Birlrlrn~~ - Oncc the documentation is complete, the City will advertise I~or, receive and <br />tabulate bids for the project. The "hroyer Group anticipates questions durinti the <br />bidding process along with potentially sonic clarifications that ~r~ill need to be issued <br />through addendum(s). The Troyer Group will review and rcconunend a successful <br />bidder to the City. ~~'e propose doiug this phase of the project at time and expense <br />(2.85 times our direct billable cost) plus reimbursable expenses (times 1.2) and <br />estimate that the cost would be $2,500 to $10,000. <br />5. Ca~strsction Adnrinisb•atio» - We understand The Bureau of Public Construction will <br />h~uadle all the construction administration with the exception of what is required by the <br />Architect/t;ngineer for certification of the construction: our assumption is that the <br />construction contract ~~i11 also be handled by the Bureau. ~fhe tollo~a-ing arc services <br />[hat aced to be provided by The Troyer Group: <br />a. fihop drawings review Struchn-al rebar, structural steel, the curtain ~~-all system. <br />mecJ~anical equipment, electrical equipment. and miscellaneous other shop <br />drawings will need to be reviewed by the certifying ArchitcctiEnginecr. ~'1'e <br />propose doing ibis phase of the project at time and expense (2.85 times our <br />direct billable cost) plus reimbursable expenses (times 1.2) and estimate that <br />the cost would be $8,000 to 512,000. <br />b. Construction Observation - The Architect oC Record should mal<c observation <br />field visits as follows Kich-off meeting, I-? visits during Dcmo, 1-2 visits as <br />curtain wall is installed, 1 for finish observation, and I for the final punch. Thr; <br />Structural Ens~,ineer ~~~ill need to visit as Collows: 2 visits during demo, ~~,~hen rebar <br />is installed, and 3 visits during steel erection. ~I11e ~9echanical Engineer needs to <br />visit during rou~~h-in of cyuipmcnt, above ccilin~~ punch prior to ceiling installation, <br />and for [final pouch. 7~he Elecuical Engineer needs to ~-~isit after conduit rou~~h-in <br />but prior to drywall installation, and for the final rcvicwipunch. ~Ve propose doing <br />this phase of the project at time and expense (2.85 times our direct billable <br />cost) plus reimbursable expenses (times 1.2) and estimate that the cost ~m~ould <br />he $10,000 to $15,000. <br />c. Request for Information /Proposal Requests - It is unknown how much time will <br />be required for the RFI~s /PR's. We assume the Bureau will handle the u~ajority of <br />this wort:, but the certifying Architect will need to know what had been altered <br />from the original documentation. We propose doiug this phase of the project at <br />time and expense (2.85 times our direct billable cost) plus reimbursable <br />expenses (times 1.2). <br />d. Cerli[icate of PavmenL Review Sinec rc<~ularly scheduled observation field visits <br />are not requested, tlic Ccrlihcation of Pa~~men~ ~~~'ill aced to he completed by (he <br />Bureau of Public Construction. <br />