Laserfiche WebLink
REGULAR MEETING FEBRUARY 25, 2014 55 <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination Commitment for <br />Contractors and Certification of Use of United States Steel Products or Foundry Products was <br />submitted. <br />Bid Bond was not submitted. <br />Indiana Local Business Preference Claim Submitted. <br />QUOTE: <br />Item <br />Est. <br />No, <br />Qty. <br />Item <br />Unit Price <br />Total <br />1 <br />41 <br />Roadway LED Luminaire with <br />existing pole adaptor and hardware <br />$868.13 <br />$78,999.83 <br />TERMS <br />-NET 30 <br />KIRBY RISK ELECTRICAL SUPPLY <br />1331 N. Iowa Street <br />South Bend, IN 46628 <br />Bid was signed by: Jason Dittmar <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination Commitment for <br />Contractors and Certification of Use of United States Steel Products or Foundry Products was <br />submitted. <br />Ten (10%) Bid Bond was submitted. <br />Indiana Local Business Preference Claim Submitted. <br />QUOTE: <br />Item <br />Est. <br />No. <br />Qty. <br />Item <br />Unit Price <br />Total <br />1 <br />91 <br />Roadway LED Luminaire with <br />existing pole adaptor and hardware <br />$885.00 <br />$80,535.00 <br />Upon a motion made by Ms. Roos, seconded by Mr. Henthom and carried, the above Quotations <br />were referred to Traffic and Lighting for review and recommendation. <br />NULLIFY CONTRACT CORRECT RECORD AND APPROVE REQUEST TO RE - <br />ADVERTISE — TRUCKING OF MATERIAL FROM THE CITY OF SOUTH BEND <br />ORGANIC RESOURCES FACILITY LOSS RECOVERY FUND <br />In a letter to the Board, Mr. Matt Chlebowski, Central Services, advised the Board that on <br />December 19, 2013, the Board of Works awarded the above bid to Rose Cor, Inc. in unit prices. <br />A contract was sent to them for signature to be returned in two weeks. The City was contacted by <br />their attorney shortly afterwards, who informed them that Rose Cor was unable to perform their <br />contract. Ms. Greene stated this was a service contract, a bid bond is not required for services; <br />however the specifications included a requirement of a bid bond. She explained the Board <br />awarded the bid to the lowest responsive and responsible bidder and did not catch that Rose Cor <br />did not submit a bid bond with their bid. Even though it is not a legal requirement of a services <br />bid, the record indicating they had submitted a bid bond, needs to be corrected, she added. She <br />stated when the contractor failed to sign the contract after the award it became a null award and a <br />null contract. At this point, Ms. Greene stated, after completing the bidding process, the City can <br />now go to the open market if they choose. She added that a service is not required to be bid by <br />State law. Therefore, Mr. Gilot made a motion that three steps be approved; the award and the <br />contract be declared null; the request to re -advertise be approved; and the Minutes of November <br />11, 2013 be corrected to reflect no bid bond was submitted by Rose Cor. Ms. Roos seconded the <br />motions, which carried. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — DIAMOND AVENUE STORM SEWER <br />SEPARATION PHASE 3 — PROJECT NO. 109-033C 2012 SEWER BOND <br />Mr. Gilot advised that Toy Villa, Engineering, has submitted the Project Completion Affidavit <br />on behalf of Woodruff & Sons, Inc., P. O. Box 450, Michigan City, Indiana 46361, for the above <br />referenced project, indicating a final cost of $2,526,721.73. Upon a motion made by Ms. Roos, <br />seconded by Mr. Henthorn and carried, the Project Completion Affidavit was approved. <br />