Laserfiche WebLink
28K <br />c. Drainage and Maintenance <br />Open off street loading facilities shall be graded, <br />drained and surfaced as required for parking areas <br />in subsection 10 -c and d above. <br />12. Submission and Approval of Plans <br />Plans of proposed parking and /or loading facilities *shall <br />be submitted to the Building Commissioner for his approval <br />at the time of application for a building permit. The <br />plans shall show the proposed location, arrangement, and <br />number of all parking and loading facilities required in <br />accordance with the provisions of this Ordinance. <br />The location and design of entrances and exits shall be <br />in accord with the requirements of applicable City of <br />South Bend regulations and standards and plans for such <br />openings onto public streets shall be submitted to the <br />City Engineer for his approval. <br />