My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2014
>
01-30-14 Redevelopment Commission Meeting
>
6A(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 1:10:37 PM
Creation date
1/27/2014 11:05:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />Board of Public Works <br />Contract Amendment <br />Colfax & Hill Drainage Improvements <br />January 22, 2014 <br />Page 2 of 3 <br />WORK PLAN <br />PROJECT SCOPE <br />The proposed project consists of the following: <br />1. Revising lane configurations to establish on- street parking on Colfax Avenue by Hill <br />Street. Utilize "Complete Streets" philosophy in determining optimal lane configuration. <br />2. Curb and sidewalk construction in limited areas. <br />3. Landscaping and Street lighting. <br />4. Parking space striping on Hill Street. <br />5. Construction of a subsurface drainage system and asphalt pavement parking lot for a <br />new mixed used building proposed on the northwest corner of Colfax and Hill Street. <br />SCOPE OF SERVICES <br />Based upon our understanding of the project goals and objectives, we propose to perform the <br />following services to assist the City with completing this community enhancement project: <br />Task #5: Additional Field Survey <br />This work includes obtaining field information on current road widths for use in designing driving <br />and parking lane configurations. <br />Task #b: Traffic Study <br />This work includes reviewing road widths, bike lanes and current and future traffic patterns on <br />Hill Street from Washington to LaSalle and on Colfax from St. Joseph to St. Louis. This work <br />includes performing a capacity analysis on the intersections of Colfax & Hill Street and Colfax <br />& Niles Avenue to determine if left turn lanes can be eliminated. This work also includes <br />meetings and discussions with representatives from the City, Church & School as well as review <br />of existing traffic patterns in the alleys in this area. <br />Task #7: Preliminary Design <br />This work includes preparing preliminary drawings and construction cost estimates for the <br />proposed project for review by the City and the Developer. We anticipate these documents <br />will include a typical cross section, proposed travel lanes, parking lanes and bike lane widths <br />and locations as well as proposed curb, sidewalk and lighting improvements. <br />Task #8: Construction Documents <br />This work includes preparing construction documents for work to be completed in the right -of- <br />way as well as the parking lot construction and drainage improvements. This task includes <br />preparing detailed specifications and calculating quantities to include in the bid package. <br />
The URL can be used to link to this page
Your browser does not support the video tag.