Laserfiche WebLink
C <br />4. Increase circulation ability to aid in fighting an <br />emergency such as for example a shock load of indus- <br />trial waste. <br />S. Installation of gas meters to monitor gas production <br />and digester performance. <br />During 1970 we also did work on Digester No. 3, very similar in <br />nature to the work now planned for Digester Nos. 2 and 4. If we can <br />provide you with additional infotbmation, please let us know. <br />John L. Hunter <br />