Laserfiche WebLink
REGULAR MEETING NOVEMBER 12, 2013 338 <br />the amount of $547,785.00. Therefore, Ms. Roos made a motion that the recommendation be <br />accepted and the bid be awarded and the contract approved as outlined above. Mr. Mecham <br />seconded the motion, which carried. <br />TABLED - AWARD BID AND APPROVE CONTRACT — NINE (9) COMPLETE RADIO - <br />FREQUENCY IDENTIFICATION (RFID) ON -BOARD SYSTEMS FOR SOLID WASTE <br />DIVISION <br />Eric Horvath, Director of Public Works requested that this award be tabled until there is an <br />opportunity to demonstrate the system capabilities to the Board of Public Works. Therefore, Mr. <br />Mecham made a motion that this award be tabled. Ms. Roos seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — SALE OF CITY PROPERTY -1219 HOWARD <br />STREET <br />Debrah Jennings, Community Investment, advised the Board that on October 22, 2013, bids were <br />received and opened for the above referenced property. After reviewing those bids, Ms. Jennings <br />recommended that the Board award the contract to the highest, best use of the property, bidder, <br />Five Corners, LLC, 814 Marietta, South Bend, Indiana 46601, in the amount of $2,438.00. <br />Therefore, Ms. Roos made a motion, that the recommendation be accepted and the bid be <br />awarded as outlined above. Mr. Relos seconded the motion, which carried. <br />AWARD QUOTATION — HISTORICAL STREET LIGHT REPLACEMENT — EAST <br />WAYNE HISTORICAL DISTRICT <br />Paul South, Street Department, advised the Board that a quotation was received for light poles <br />from Traditional Concrete, Inc. based on Proprietary Material Justification for Historical <br />Requirements. After reviewing that quotation, Mr. South recommended that the Board award the <br />contract to Traditional Concrete, Inc., P.O. Box 157, Menomonee Falls, Wisconsin 53052-0157 <br />in the amount of $8,100.00. Therefore, Ms. Roos made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Mr. Mecham seconded the motion, <br />which carried. <br />AWARD QUOTATION — HISTORICAL STREET LIGHT REPLACEMENT — EAST <br />WAYNE HISTORICAL DISTRICT <br />Paul South, Street Department, advised the Board that a quotation was received for light fixtures <br />from Herwig Lighting, Inc. based on Proprietary Material Justification for Historical <br />Requirements. After reviewing that quotation, Mr. South recommended that the Board award the <br />contract to Herwig Lighting, Inc., P.O. Box 768, Russellville, Arkansas 72811 in the amount of <br />$12,455.00. Therefore, Ms. Roos made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Mecham seconded the motion, which carried. <br />APPROVAL OF REQUEST TO REJECT BIDS — ONE (1) OR MORE 2013 OR NEWER <br />SINGLE AXLE DUMP TRUCK WITH 14' DUMP BED <br />In a memorandum to the Board, Jeff Hudak, Central Services, requested permission to reject all <br />bids for the above referenced equipment due to budget constraints. Therefore, upon a motion <br />made by Ms. Roos, seconded by Mr. Relos and carried, the above request was approved. <br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— COLD MILLING — 2013 PAVING PROGRAM — PROJECT NO 113-012 <br />(STREETS/PAVING) <br />Mr. Gilot advised that Mr. Paul South, Street Department, has submitted Change Order No. 1 <br />(Final) on behalf of J.L. Milling, Inc., 15262 Industrial Drive, Vicksburg, Michigan 49087, <br />indicating the contract amount be decreased by ($32,960.82) for a modified contract sum, <br />including this Change Order, of $42,039.18. Additionally submitted was the Project Completion <br />Affidavit indicating this new final cost of $42,039.18. Upon a motion made by Ms. Roos, <br />seconded by Mr. Relos and carried, Change Order No. 1 (Final) and the Project Completion <br />Affidavit were approved. <br />APPROVE CHANGE ORDER NO 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— CURB MACHINE SERVICES — PROJECT NO 112-024 (STREETS) <br />Mr. Gilot advised that Mr. Paul South, Street Department, has submitted Change Order No. 1 <br />(Final) on behalf of Selge Construction Company, Inc., 2833 South I I'h Street, Niles, Michigan <br />49120, indicating the contract amount be decreased by ($42,018.75) for a modified contract sum, <br />including this Change Order, of $7,781.25. Additionally submitted was the Project Completion <br />