REGULAR MEETING
<br />NOVEMBER 12, 2013 337
<br />Quotation was submitted by Mr. William Loudin
<br />QUOTATION:
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total
<br />Amount
<br />I
<br />Demolish 913-915 West Indiana
<br />Avenue
<br />I
<br />Lump Sum
<br />$18,525.00
<br />$18,525.00
<br />2
<br />DemoAvenulesh 725-747 West Indiana
<br />1
<br />Lump Sum
<br />$36,147.00
<br />$36,147.00
<br />3
<br />Clear Property at 1522 Prairie
<br />Avenue
<br />I
<br />Lump Sum
<br />$2,000.00
<br />$2,000.00
<br />4
<br />Remove Existing Curbing
<br />45
<br />LF
<br />$10.00
<br />$450.00
<br />5
<br />Remove Existing Sidewalk
<br />25
<br />SYD
<br />$10.00
<br />$250.00
<br />Remove 24" Tree on Kemble
<br />6
<br />Ave., cut off flush with the
<br />1
<br />EA
<br />round
<br />$2,000.00
<br />$2,000.00
<br />7
<br />Install New Straight Curb
<br />45
<br />LF
<br />$55.00
<br />$2,475.00
<br />8
<br />Install New 4" Concrete
<br />Sidewalk
<br />25
<br />SYD
<br />$90.00
<br />$2,250.00
<br />9
<br />Environmental Allowance
<br />1
<br />Lump Sum
<br />$5,000.00
<br />$5,000.00
<br />Total Amount of Quote (Calculate
<br />Here and Copy
<br />of First Page
<br />of Quote Form)
<br />$69,097.00
<br />RITSCHARD BROS., INC.
<br />1204 West Sample Street
<br />South Bend, Indiana 46619
<br />Quotation was submitted by Mr. Donald Ritschard, Jr.
<br />QUOTATION:
<br />Item
<br />No.
<br />Description
<br />QuantityUnit
<br />Unit Price
<br />Total
<br />Amount
<br />I
<br />Demolish 913-915 West Indiana
<br />Avenue
<br />I
<br />Lump Sum
<br />$21,953.00
<br />$21,953.00
<br />2
<br />Demolish 725-747 West Indiana
<br />Avenue
<br />I
<br />Lump Sum
<br />$46,122.00
<br />$46,122.00
<br />3
<br />Clear Property at 1522 Prairie
<br />Avenue
<br />I
<br />Lump Sum
<br />$7,522.00
<br />$7,522.00
<br />4
<br />Remove Existing Curbing
<br />45
<br />LF
<br />$28.00
<br />$1,260.00
<br />5
<br />Remove Existing Sidewalk
<br />25
<br />SYD
<br />$28.00
<br />$700M
<br />Remove 24" Tree on Kemble
<br />6
<br />Ave., cut off flush with the
<br />1
<br />EA
<br />7
<br />ground
<br />$3,000.00
<br />$3,000.00
<br />Install New Straight Curb
<br />45
<br />LF
<br />$58.00
<br />$2,610.00
<br />8
<br />Install New 4" Concrq
<br />Sidewalk
<br />25
<br />SYD
<br />$100.00
<br />$2,500.00
<br />9 I
<br />Environmental Allowance I
<br />I
<br />Lump Sum
<br />$5,000.00
<br />$5,000.00
<br />Total Amount of Quote (Calculate
<br />Here and Copy
<br />of First Page
<br />of Quote Form)
<br />$9Q667.00
<br />Upon a motion made by Mr. Mecham, seconded by Ms. Roos and carried, the above Quotations
<br />were referred to Engineering for review and recommendation.
<br />REJECT AND RETURN - OPENING OF QUOTATIONS SOUTH BEND POLICE
<br />DEPARTMENT RECORDING SYSTEM
<br />Ms. Roos recommended that this Opening of Quotations be tabled due to Terms and Conditions
<br />not being clear in the specifications, and some documents that should have been included were
<br />missing. She noted the City is not ready to bid this equipment at this time. Therefore, all bids
<br />received will be rejected and returned unopened. Upon a motion made by Mr. Relos, seconded
<br />by Mr. Mecham, and carried, the above Quotations were rejected.
<br />AWARD BID AND APPROVE CONTRACT — SAGE ROAD AND POPPY ROAD LIFT
<br />STATION MODIFICATIONS —PROJECT NO 113-039
<br />Jacob Klosinski, Environmental Services, advised the Board that on October 22, 2013, bids were
<br />received and opened for the above referenced project. After reviewing those bids, Mr.
<br />Kloskinski recommended that the Board award the contract to the lowest responsive and
<br />responsible bidder Selge Construction Co., Inc., 2833 S. 1 Ith Street, Niles, Michigan 49120, in
<br />
|