Laserfiche WebLink
4. Workmen's Compensation: Statutory State of Indiana Employer's Liability - $100,000. <br /> 5. Auto Liability: Bodily Injury and Property Damage Combined Single limit- $1,000,000 <br /> 6. City of South Bend shall be named as additional insured on the Certificate. <br /> VIII. DEWATERING AND PROTECTION OF EXISTING STRUCTURES <br /> A. Prevailing Specifications/INDOT Standard Specifications Section: None <br /> B. Additions: <br /> 1. The Contractor shall be responsible for providing all materials necessary for the <br /> dewatering and protection of existing structures to perform the work included on this <br /> project. <br /> 2. The Contractor shall submit a Dewatering and Protection of Existing Structures Plan to <br /> the Owner and Engineer for review prior to beginning any work affected by the control of <br /> ground water and protection of existing structures. The plan shall include drawings, <br /> calculations and descriptions, as necessary, to clearly describe the nature of the methods <br /> to be used by the Contractor. The plan must be prepared, signed and sealed by a <br /> Professional Engineer registered in the State of Indiana, who is experienced in <br /> dewatering techniques and support of structures and hydraulic loadings. The plan must <br /> be submitted, reviewed and comments addressed adequately before the start of <br /> construction. The responsible Professional Engineer shall supervise and monitor the <br /> installation and operation of the dewatering/protection of existing structures elements. <br /> The Contractor shall have full responsibility for the adequacy of the dewatering methods <br /> of the diversion/retention systems used, and for protection of all existing structures. <br /> 3. Foundations and all other parts of the construction site shall be dewatered and kept free <br /> of standing water and muddy conditions, as necessary, for the proper execution of the <br /> work. The Contractor shall install, maintain, and operate all cofferdams, sumps, and <br /> other temporary diversion and protective works needed to control ground water and <br /> surface water at the site. Since the work will be performed in a residential/commercial <br /> area, all continuously operating equipment such as pumps and generators must be <br /> muffled and enclosed in noise dampening structures so as not to cause a nuisance to <br /> nearby residences and commercial establishments. <br /> 4. Control of surface and groundwater shall be continuous during the period of construction <br /> so that damage to the work shall not occur. Removal of water from the construction site <br /> shall be performed so that erosion and the transporting of sediment and other pollutants <br /> are minimized. When temporary works used for dewatering are no longer needed, the <br /> Contractor shall remove them and return the area to a condition similar to that which <br /> existed prior to construction. <br /> IX. SANITARY SEWER AND LATERALS <br /> A. Prevailing Specifications/INDOT Standard Specifications Section: 2001, 2100, 715 and City <br /> Standard Drawings WW-2, WW-3, WW-6, WW-7 and WW-8. <br /> B. Additions: <br /> 1. This work shall entail the removal of conflicting portions of existing sanitary laterals and <br /> the reinstatement of said laterals encountered in the progress and prosecution of the work <br /> and the installation of new sanitary sewer pipe and laterals and connection to the existing <br /> system. <br /> 18 <br />