My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B2
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
10-22-13
>
6B2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:17:40 PM
Creation date
10/21/2013 10:54:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Ann Kolata <br />SB1070.A00.0002 <br />October 15, 2013 <br />Page 7 <br />completed by the end of December 2013. <br />COMPENSATION <br />A breakdown of costs is attached as Table 1. The fees have been developed based on our estimate of hours <br />for each labor category expected to be involved in the project. The project will be billed on a four -week <br />basis with payment due to Hull within thirty days after receipt of an invoice. <br />ADDITIONAL WORK <br />Additional work beyond the Scope of Work defined herein shall not be performed until such time as an <br />amendment to this proposal, including the scope of the additional work and associated costs, has been <br />prepared in writing to address the additional work and said amendment has been approved by the Client in <br />writing. <br />Specific items not within the Scope of Work on this project include, but are not limited to the following <br />1 . collection of more than 65 groundwater samples (including QA /QC samples) to be analyzed <br />for VOCs in accordance with U.S. EPA Method 8260 per quarterly sampling event; <br />2. collection and analysis of more than 23 soil samples, including QA /QC samples, for chemical <br />analysis; <br />3. disposal of groundwater or soil that is determined to be hazardous; and <br />A. communication with regulatory agencies regarding the Site. <br />No amendment to this proposal shall be required in situations where additional work may be necessary, as a <br />result of unanticipated or unidentified conditions including, but not limited to, the presence of unidentified or <br />mislocated buried utilities, structures, or objects and unanticipated hazardous materials and /or hazardous or <br />dangerous circumstances, to complete previously identified tasks. Hull shall be compensated for the actual time <br />spent performing this additional work and other direct expenses and subcontractor fees at the billing rates <br />outlined in Table 2. <br />STANDARD OF CARE AND LIMITATIONS <br />Hull shall perform its services using that degree of care and skill ordinarily exercised under similar conditions <br />by reputable members of its profession practicing in the some or similar locality at the time of service. No <br />other warranty, expressed or implied, is made or intended by our proposal or by our oral or written reports. <br />The work will not attempt to evaluate past or present compliance with federal, state, or local environmental or <br />land use laws or regulations. Conclusions presented by Hull regarding the Site to be investigated shall be <br />consistent with the Scope of Work, level of effort specified, and investigative techniques employed. Reports, <br />opinions, letters, and other documents will not evaluate the presence or absence of any compound or <br />parameter not specifically analyzed and reported. The presence of radiation, radon, lead, electromagnetic <br />fields, and indoor air pollution will not be investigated, unless specifically stated in the scope of work. Hull <br />makes no guarantees regarding the completeness or accuracy of any information obtained from public or <br />private files or information provided by subcontractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.