My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B2
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2013
>
10-22-13
>
6B2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2014 12:17:40 PM
Creation date
10/21/2013 10:54:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
II.HULL <br />October 15, 2013 <br />Ms. Ann Kolata <br />Senior Redevelopment Specialist <br />City of South Bend Department of Community Investment <br />227 West Jefferson Blvd, 13'^ Floor <br />South Bend, Indiana 46601 <br />RE: Proposal to Conduct On- and Off -Site Groundwater Delineation, On -Site Soil Sampling, and Other <br />Necessary Steps for Additional Assessment Activities at the Oliver Industrial Park Located Near Chapin <br />Street and Oliver Plow Court, South Bend, Indiana; SB1070.400.0002. <br />Dear Ms. Kolata: <br />Hull & Associates, Inc. (Hull) is pleased to present the City of South Bend (Client) the following proposal to <br />provide professional engineering services for the above - referenced project. The purpose of this document is to <br />establish the Scope of Work as we understand it and to provide a fee schedule for the project. This proposal <br />presents Hull & Associates, Inc.'s (Hull's) recommendations for additional tasks needed to conduct additional <br />assessment activities and prepare an amended Indiana Voluntary Remediation Program (VRP) Remediation <br />Work Plan (RWP) for the three vacant parcels of the Oliver Industrial Park (the Site) and additional off -site <br />properties. <br />Site Physical Setting and Background <br />The Site is located approximately one mile southwest of downtown South Bend. From 1876 to 1989, activities <br />at the Site included the manufacture of farm machinery and implements. The Site consists of several vacant lots <br />and commercial /light industrial businesses, and is bordered by commercial /industrial properties to the <br />southwest, south, and east of the Site; and an active rail line along the northern boundary of the Site. <br />Residential properties are located across the western and northern boundaries of the Site. The Site is <br />comprised of three vacant parcels totaling approximately 14.45 acres ( + / -) of land located near the <br />intersection of Chapin Street and Oliver Plow Court in South Bend, Indiana. The Site formerly comprised <br />approximately 36 acres of land, but the City and private entities have redeveloped portions of the Oliver <br />Industrial Park, effectively removing certain parcels of the Site from inclusion in the VRP. <br />Multiple environmental assessments have been conducted at the Site. Soil sampling completed thus far has <br />revealed that benzo(a)pyrene, dibenz(a,h)anthrocene, tetrachloroethene, and TPH (historically detected in one <br />location by obsolete method 418.1) are the only chemicals of concern (COCs) in soils that exceed their <br />respective VRP Tier II Nonresidential Cleanup Goals. <br />Extensive on- and off -Site groundwater testing completed thus far has revealed that tetrachloroethene (PCE), <br />trichloroethene (TCE), and vinyl chloride (VC) are the only COCs in groundwater that exceed their respective <br />VRP Tier II Nonresidential Cleanup Goals or the Indiana Department of Environmental Management's (IDEM's) <br />2012 Remediation Closure Guide (RCG) Commercial and /or Residential Groundwater Screening Levels. <br />In December 2011, Hull submitted a RWP for the Site that presented a general path forward for additional <br />assessment and remediation pursuant to VRP requirements. In May 2013, IDEM responded with comments to <br />the RWP. The City and Hull responded to IDEM's comments in a letter dated August 1, 2013. That August 1, <br />2013 letter outlined additional assessment activities that would be initiated by the City, and proposed an <br />8470 Allison Pointe Boulevard, Suite 120, Indianapolis, Indiana 46250 <br />800.241.7173 614.793.9070 fax www.hullinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.