My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
09/24/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:30 PM
Creation date
10/11/2013 8:42:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MF.ETING <br />SEPTF,MBER24 2013 276 <br />Lead Monitoring— including all air and <br />2 <br />wipe sampling, testing, and reporting <br />I <br />Lump Sum <br />S15,000.00 <br />during abatement and clearance. <br />3 <br />Alternate #1-Eneapsulationof Lead- <br />Based Paint in lieu of removal <br />(-50,000) <br />Square Foot $20,000.00 <br />Removal, Management, and Disposal of <br />'. <br />Regulated Asbestos -containing Materials <br />4 <br />(including materials within pits, tunnels, <br />I <br />Lump Sum <br />$180,000.00 <br />basements, vaults and chases) in <br />accordance with Contract Documents and <br />Specifications <br />Removal, Management, and Disposal of <br />5 <br />Asbestos -containing Floor Tile and Mastic <br />2000 <br />Square Foot <br />$5,000.00 <br />in accordance with Contract Documents <br />and Specifications <br />Asbestos Air Monitoring including all <br />6 <br />sampling, testing, and reporting during <br />1 Lump Stun <br />$9,000.00 <br />abatement and clearance. <br />'IO'1'AL AMOUNTITEMS 1 '1'HRU 6 $5,975,000.00 <br />INTERSTATE ENVIRONMENTAL SERVICES, INC. <br />337 West 806 North <br />Valparaiso, Indiana 46385 <br />Bid was signed by: David G. Schutkovske <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Item <br />No. <br />Description <br />Quantity <br />Unit Price <br />Total <br />Amount <br />Removal, Management, and Disposal of <br />1 <br />Lcad-based Paint in accordance with <br />1 <br />Lump Sum <br />$4,951.500.00 <br />Contract Documents and Specifications <br />Lead Monitoring —including all air and <br />2 <br />wipe sampling, testing, and reporting <br />1 <br />Lump Senn <br />$250,000.00 <br />during abatement and clearance. <br />Alternate 41 - Encapsulation of Lead - <br />Based Paint in lieu of removal <br />(-50,000) <br />Square Foot <br />N/A <br />Removal, Management, and Disposal of <br />_ <br />Regulated Asbestos -containing Materials <br />4 <br />(including materials within pits, tunnels, <br />basements, vaults and chases) in <br />1 <br />Lump Sum <br />$650,000.00 <br />accordance with Contract Documents and <br />Specifications <br />5 <br />Removal, Management, and Disposal of <br />Zo00 <br />Square Foot <br />S3,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.