REGULAR MEETING AUGUST 27 2013 252
<br />OPENING OF QUOTATIONS _ = EAST RACE DOCK „EXTENSION EROSION REPAIR ---
<br />PROJECT NO. 113-019B„(SEWER REHAB)
<br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for
<br />the above referenced project. The following Quotations were opened and read:
<br />LANDMARK LANDSCAPING
<br />10882 McKinley Highway
<br />Osceola, Indiana 46561
<br />Quotation was submitted by Mr. Steve Solliday
<br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility
<br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use
<br />of United States Steel Products or Foundry Products was Submitted
<br />QUOTATION: $13,587.00
<br />FUERBRINGER LANDSCAPING &_D_ESIGN, INC.
<br />22530 Brick Road
<br />South Bend, Indiana 46628
<br />Quotation was submitted by Mr. Dan Fuerbringer
<br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Employment Eligibility
<br />Verification, Non -Discrimination Commitment for Contractors and Certification of Use
<br />of United States Steel Products or Foundry Products was Submitted
<br />QUOTATION: $39,900.00
<br />It was noted that Fuerbringer Landscaping & Design, Inc., did not submit their
<br />Acknowledgement of Addendum and their quote was deemed unresponsive. Upon a motion
<br />made by Ms. Roos, seconded by Mr. Mecham and carried, the above Quotations were referred to
<br />Engineering for review and recommendation.
<br />AWARD BID — TWO (2) 2014 OR NEWER 22-CUBIC YARD DUAL ARM SIDE LOADING
<br />REFUSE TRUCKS (2013 SOLID WASTE CAPITAL PRINCIPAL AND INTEREST) ...,.,.....-----
<br />.
<br />Mr. Matt Chlebowski, Central Services, advised the Board that on July 23, 2013, bids were
<br />received and opened for the above referenced vehicles. After reviewing those bids, Mr.
<br />Chlebowski recommended that the Board award the contract to the lowest responsive and
<br />responsible bidder Best Equipment Company, Inc., 5550 Poindexter Drive, Indianapolis, Indiana
<br />46235, in the amount as follows:
<br />Description
<br />Qty
<br />Unit Price
<br />Total
<br />2014 Freightliner SDI 14 with Labrie Dual
<br />Arm Helping Hand
<br />2
<br />$312,349.00
<br />$624,698.00
<br />Truck Scales
<br />2
<br />Included
<br />CNG
<br />2
<br />$41,459.00
<br />$82,918,00
<br />New Units Complete
<br />2
<br />$707,616.00
<br />Trade -Ins
<br />3
<br />$52,000.00
<br />($156,000.00)
<br />Purchase Price 2 Units Complete
<br />$551,616.00
<br />Therefore, Mr. Relos made a motion that the recommendation be accepted and the bid be
<br />awarded as outlined above. Mr. Mecham seconded the motion, which carried.
<br />AWARD QUOTATION AND APPROVE CONTRACT __ CURB AND SIDEWALK
<br />CONSTRUCTION (2013 CURB AND SIDEWALK.,PROGRAM)_—_ PROJECT NO. 113-01D
<br />(MVH — CURB AND SIDEWALK)
<br />Mr. Paul South, Streets, advised the Board that on August 13, 2013, quotations were received
<br />and opened for the above referenced project. After reviewing those quotations, Mr. South
<br />recommended that the Board award the contract to the lowest responsive and responsible bidder
<br />Walsh & Kelly, Inc., 24358 SR 23, South Bend, Indiana 46614, in unit price amounts.
<br />Therefore, Mr. Relos made a motion that the recommendation be accepted and the quotation be
<br />awarded and the contract approved as outlined above. Mr. Mecham seconded the motion, which
<br />carried.