Laserfiche WebLink
REGULAR MEETING AUGUST 13 2013 235 <br />Mr. Gilot questioned if any quotes were solicited from any other contractors. Mr. Paul South, <br />Street Department, stated McIntyre Jones was sent a request for quotes also, but did not submit <br />one. Ms. Greene noted that due to the number of unit prices, a bid tab would be created. Upon a <br />motion made by Mr. Mecham, seconded by Mr. Relos and carried, the above Quotations were <br />referred to the Street Department for review and recommendation. <br />AWARD BID AND APPROVE CONTRACT — INFRARED PAVEMENT PATCHING — <br />PROJECT NO. 113 -014 STREETS —PAVING) <br />Mr. Paul South, Director of Street Department, advised the Board that on July 23, 2013, bids <br />were received and opened for the above referenced project. After reviewing those bids, Mr. <br />South recommended that the Board award the contract to the lowest responsive and responsible <br />bidder Asphalt Restoration Services, PO Box 2484, South Bend, Indiana 46680, in unit price <br />amounts of $3.06 /sft for 2" depth infrared patch and S3.13 /sft for 4" depth infrared patch. <br />Therefore, Ms. Roos made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved as outlined above. Mr. Mecham seconded the motion, which <br />carried. <br />AWARD BID — ONE f 1 22 -CUBIC YARD DUAL ARM SIDE - LOADING REFUSE TRUCK <br />2013_ SOLID WASTE CAPITAL) <br />Mr. Matthew Chlebowski, Central Services, advised the Board that on July 23, 2013, bids were <br />received and opened for the above referenced truck. After reviewing those bids, Mr. Chlebowski <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Best Equipment Co., Inc., 5550 Poindexter Drive, Indianapolis, Indiana, 46235 in the amount of <br />$249,000.00 for the used demonstrator unit. Therefore, Ms. Roos made a motion that the <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Mecham seconded <br />the motion, which carried. <br />AWARD QUOTATION — EAST RACE FLOATING DOCK REPLACEMENT — PROJECT <br />NO. 113 -019A SEWER REHAB <br />Mr. Patrick Henthorn, Engineering, advised the Board that on July 23, 2013, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Henthorn recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, GUS Commercial Divers, Inc., 12839 Industrial Park Drive, PO Box 516, <br />Granger, Indiana 46530, in the amount of $64,000.00. Therefore, Mr_ Mecham made a motion <br />that the recommendation be accepted and the quotation be awarded as outlined above. Mr. Neal <br />seconded the motion, which carried. <br />AWARD Q110TATION — NORTH STATION RESERVOIR PAINTING — PROJECT NO. 113- <br />028 WATER WORKS OPERATING <br />Mr. John Wiltrout, Water Works, advised the Board that on July 23, 2013, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Wiltrout recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, Indiana <br />46628, in the amount of $10,090.00. Therefore, Mr. Relos made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Roos <br />seconded the motion, which carried. <br />APPROVAL OF REQUEST TO REJECT PROPOSALS — MANAGEMENT AND <br />MARKETING OF THE CITY OF SOUTH BEND ORGANIC RESOURCES FACILITY <br />In a memorandum to the Board, Mr. Al Greek, Environmental Services, requested permission to <br />reject all proposals for the above referenced service. Mr. Greek noted in his Memorandum that <br />Coker Composting and Consulting, the consultant assisting with the procurement of an outside <br />contractor, stated that neither company submitting a proposal offered the City any cost savings <br />over current expenses, nor did either proposal address the legacy pile of unscreened, unsold <br />compost, which creates considerable financial uncertainty and potential liability for the City. <br />Therefore, upon a motion made by Ms. Roos, seconded by Mr. Neal and carried, the above <br />request to reject all proposals was approved. <br />APPROVE CHANGE ORDER NO. 1 — PRIMARY CLARIFIER REHABILITATION AND <br />EQUIPMENT UPGRADES --- PROJECT NO. 111 -071 CWASTEWATER CAPITAL FUND <br />Mr. Gilot advised that Mr. Jacob Klosinski, Environmental Services, has submitted Change <br />Order No. 1 on behalf of L.D. Docsa Associates, Inc., 1605 King Highway, Kalamazoo, <br />