Laserfiche WebLink
block on Lincolnway East, Remonstrate Pgainst any further action by your honorable body in <br />the matter of a proposed amendment,.supple.ment or chence of the building regulations prescribed <br />for*this district to permit the erection of an automobile Service -or Filling Station at the <br />southeast corner of Lincolnwry East and Leer Street. <br />- Respectfully, <br />24 signers. <br />Councilman Goetz moved that said be referred to the zoning commission. Councilman. Rasmussen <br />seconded the motion. Motion carried. <br />REPORT OF THE CITY - CONTROLLER OF THE CITY OF SOUTH BEND FOR THE MONTH OF DECEMBER, 1936 <br />Balance on Hand first on month - - - - - -- - - - - - - - - - - - - - - $907,318.04 <br />Balance onLecember3lst, 1936------------------- - - - - -- -$931, 88.07 <br />Respectfully Submitted, Fred Woodward, City Controller, Report accepted by the Council and <br />ordered to be placed on file. Motion carried. <br />TO THE HONORABLE COMMON COUNCIL <br />CITY OF SOUTH BEND, INDIANA <br />HONORABLE SIRS: <br />1936. <br />The following is e report of the work done 'by my departments during the month of December, <br />1,919 paper cans emptied <br />262 loads of cinders put in holes in streets and alleys <br />213 loads of cinders spread on icy pavements <br />62 loads of cinders hauled to stock pile <br />393 miles of streets cleaned by machine <br />30 blocks of streets cleaned by hand <br />660 blocks of streets, and alleys cleaned by cart men <br />494 loads of sweepings hauled to dump <br />129 blocks of streets flushed <br />37 intersections cleaned <br />6,637 small beericades placed <br />3,265 large barricedes placed <br />2,782 danger bonbs placed <br />1 street cane -in repaired <br />368 dead animals taken to dump <br />51 loads of scrap asphalt hauled to yard <br />16 loads of send and gavel hauled to yard <br />582 holes in streets repaired with cold pack asphalt <br />3 cuts in conorete pavement repaired <br />23 cuts in brick pavement repaired <br />48 cuts in a.sphFalt pavement repaired <br />42 tons of scrap asphalt cooked and used on streets <br />23 "glass in street" calls answered <br />175- street signs repaired <br />1 loedJ of brick hauled to yard <br />3 fallen trees removed <br />49543 feet- of main sewers dragged <br />28 loads of sewer dirt hauled <br />69 main sewers flushed <br />18 private sewers flushed <br />2,451 catch basins opened <br />482 catch basins flushed <br />1 catch basins repaired <br />2 catch basins installed <br />15 manholed cleaned <br />2 manholes flushed <br />7 manholes fepaired , <br />Respectfully submitted, <br />J. C. Weer <br />Commissioner of Streets <br />TO THE HONORABLE COMMON COUNCIL <br />CITY OF SOUTH BEND INDIANA <br />HONORABLE SIRS: <br />Enclosed with this letter is the annual report of Street and 86wer Department activities <br />for the year 1936, which is a summery of the monthly reports you have received. <br />During the last twelve months it has been the aim and purpose of these departments to give <br />to the public of South Bend the most efficient service possible <br />The Winter of 1936 was unuselly severe and beside coating the Street Department a large <br />sum of money for snow removal, it ,was necessary for the department to spend a large amount for <br />the repair of pavements which were town open due to frozen water mains. The Water Department <br />installed new shut- off�va.lves throup -ITout the down town section on M chigan Street and new <br />mains on Wayne Street from Lafayette Blvd, to Lincolnway East, whicA cost a large part of our <br />appropriation to resurface. <br />Also during the year the Street Department continued the sponsorship of the-W. P. A. pro- <br />jects which included the grading and graveling of 30.15 :Hiles of streets and 11.4 miles of <br />alleys, construction of a new office building for Street Department use, cleaning of the river <br />banks and the construction of s river wall in Le$alle Park which was extended to join the wall <br />in Howard Park, and the repair and construction of sidewalks and curbs throughout the city where <br />such service was desired by the property owners. During the last two months of the years new <br />W. P. A. project was started which at the present time has completed the turning and relaying <br />of bricks on south Main Street which wi31 be continued to completion on said street end extended <br />to other thoroughfares. <br />My departments have cooperated with the W. P. A. to the extent of furnishing materiels, <br />tools, and labor to assist in the work on these projects and also, it has been necessary for <br />us to maintain the completed streets and alleys and endeavor to keep them in as good condition <br />as they were when the W. P. A. finished working on them. <br />It is our aim and desire that during the coming year we will again be able to serve the <br />Itax payers of South Bend in a manner which will be appreciated, with the fundA ir;th owhi'nh &A <br />