Laserfiche WebLink
3 <br />pails <br />.60 <br />3 <br />bells mason line <br />1.20 <br />3 <br />msttocks <br />2.34 <br />iF <br />sledges <br />7.80 <br />6 <br />barricades <br />00 <br />4.00 <br />2 <br />trowels <br />.90 <br />1176:97 . <br />2 <br />grub hoes <br />2.50 <br />250 <br />15" grade Stpkes <br />4.50 <br />1 <br />toilet <br />10.00 <br />6 <br />crowbars <br />1.50 <br />1 <br />red flag <br />.25 <br />1 <br />dipper <br />.10 <br />450 <br />bed stakes <br />$165-85r ` <br />Job #6 Robert Harris, supervisor <br />Grading end graveling in vicinitIT of Falcon St. and -Western Ave. <br />26,3F5 sq yds of rough grade <br />121,05 sq yds of sub L7rade <br />51523 sq yd.s of fi -nished gravel street <br />16, 453 sq yds of sidewalk #rad.e <br />15 stone catch basins built <br />1,720 cu yds of dirt removed <br />1,954 cu yds of gravel spread on streets <br />52 loads of stone hauled, to job <br />131 men and 12 trucks furnished by the Federal Government <br />City Cost <br />Grader furnished 5: hours <br />52.20 <br />Roller furnished 5 hours <br />4.52 <br />Proportionate cost of lighting <br />43.51 <br />46 shovels <br />59.50 <br />200 15" grade stakes <br />3.60 <br />200 241i n n <br />5-00 <br />6 rakes <br />7.44 <br />1 dipper <br />.10 <br />2 bells meson line <br />.90 <br />1176:97 . <br />Job #7 Bert Gr2ny, Supervisor <br />Grading and graveling at St. Joseph St. and .0onmoyer Ave. and other streets and alleys in vicinii <br />2,934 loads of dirt removed <br />395 cu yds of gravel spread on streets <br />7 blocks of streets- fine graded <br />5 blocks of streets rough:graded <br />2 blocks of streets graveled <br />140 men and 15 trucks furnished by the Federal Government <br />City Cost <br />Plow <br />and Tractor furnished 17 hours <br />14.24 <br />Proportionate <br />cost of lighting <br />43.51 <br />1 <br />tool box <br />15.00 <br />l <br />padlock <br />.50 <br />10 <br />mattocks <br />7.50 <br />100 <br />15" grade stakes <br />1.50 <br />6 <br />shovels <br />7.50 <br />14 <br />picks <br />17.3 <br />1 <br />pail <br />.20 <br />1 <br />dipper <br />i10 <br />5 <br />bells meson line <br />2.00 <br />5 <br />barricades <br />12.00 <br />450 <br />bed stakes <br />4 <br />push brooms <br />4.00 <br />15 <br />pick handles <br />7.50 <br />1 <br />roll roofing paper <br />� 1.50 <br />$140-71 <br />Job #16 Irvin Goss, supervisor <br />Repair of sidewalks and curb <br />This job divided into four gangs <br />GPng #1 <br />575 lin ft of sidewalk raised, lowered, and natc!LLed <br />1226 lin ft of curb raised, lowered, and patched <br />This work was done on Mprriett2 St., Lake St., Western Ave., and Kentucky St. <br />Gang__ #2 Only w ^rked .as a single unit two days <br />327 sq ft of curb raised, lowered -and patched <br />This work done on Merrietta St., Indiana Ave., Lincoln Way East and Leer S +. <br />Gang #3 <br />3,525 lin ft of sidewalk cleaned <br />155 " " " burm leveled <br />120 If " it sidewalk graded leveled <br />90 cu yds of dirt removed <br />�y <br />