Laserfiche WebLink
( CONTINUED FROM PAGE 337) <br />Job #3 John Smop-er, supervisor <br />Grading and graveling streets and alleys, 1?yinv brick and other work on N. Brookfield St., W. <br />Bully St., Elwood St., Wilbur St., VanBuren St., California Ave., Sancome St., College St., and <br />adjacent alleys. <br />360 sq yds of brick streets laid <br />11 catch basins built <br />2 manholes reset <br />50 lin ft of curb replaced <br />2 stone retaining_ walls built <br />5,266 sq yds of dirt streets graded and graveled <br />1,652 sq yds of alleys graded and graveled <br />4,Og5 cu yds of dirt removed <br />1,2 2 cu yds of gravel used <br />39 cu yds of bed sand used <br />1.3 loads of sand used <br />121 =men Fnd 14 trucks furnished by the Federal Government <br />Oity Cost <br />Plow ?nd Tractor furnished 38 hours <br />Grader furnished 21 hours <br />Proportionate cost of lighting <br />10,000 brick <br />21 sacks cement <br />2 sledges <br />3 picks <br />L� sacks lime <br />2 rakes <br />2 nieces keil <br />4 crov�ba r <br />1 toilet <br />100 24" grade stakes <br />150 1911 <br />5 barricades <br />2 points <br />2 padlocks <br />2 tool boxes <br />2 nush brooms <br />2 brick hammers <br />1 wheelbarrow <br />2 pair goggles <br />Job #4 Mr. Hutter, supervisor <br />Opening No. Side Blvd. grading and graveling <br />32.07 <br />15.90 <br />43.51 <br />30.00 <br />11.34 <br />396 <br />3. .72 <br />1.50 <br />2.36 <br />.20 <br />1.20 <br />10.00 <br />2.50 <br />2.70 <br />12.00 <br />1.50 <br />1.00 <br />30.00 <br />2. ""0 <br />2.50 <br />3.50 <br />2. -16 <br />219.12 <br />3Q,465 <br />sq yds <br />of <br />streets graded <br />4,215 <br />cu yds <br />of <br />dirt removed <br />537 <br />cu yds <br />of <br />?,r -vel dug from pit ar_d sere ^d on street <br />2,476 <br />lin ft <br />of <br />brick curb laid <br />146 men and 13 trucks furnished by Federal Government <br />City Cost <br />6 rakes - <br />4 sledges <br />4 bells mason line <br />2 peits <br />1 cup <br />125 24" grade Stares <br />50 shovels <br />1 sledge hendles <br />50 bed stakes <br />5 nicks <br />3 pitch forks <br />100 15" grade stakes <br />1 dipper <br />1 tool box <br />1 padlock <br />Proportionate cost of lighting <br />5.29 <br />7.92 <br />1.40 <br />.10 <br />3.12 <br />65.00 <br />.6o <br />9.92 <br />3.75 <br />1.50 <br />.10 <br />15.00 <br />43. .50 <br />102.10 <br />Job #5 C. Bolkp, supervisor <br />Grading streets and alleys on Pleasant St. and in vicinity <br />9,241 cu yds of dirt removed <br />4 manholes repaired <br />17 catch basins re-paired <br />72 cu vds of gravel spread on streets <br />67 lords of stone used in making Stone drains. <br />149 men and 12 trucks furnished by the Federal Government <br />City Cost <br />Plow Pnd Tractor furnished 59 hours 49.79 <br />Proportionate cost of lighting 43.$1 <br />6 shovels 1.80 <br />19 picks 23.56 <br />2 axes 3.10 <br />9 <br />• <br />1 <br />loll <br />*I <br />• <br />4 <br />• <br />• <br />