Laserfiche WebLink
( CONTINUED FROM PAGE 335) <br />400 stove bolts end. washers <br />31 nails <br />33 dipner-s <br />8 strap hinges <br />19 padlocks <br />6 brick hummers <br />2 wracking bars <br />4 claw- hammers <br />1 box lumber crayons <br />40 balls mason line <br />105 pick handles <br />6 pieces chalk <br />Lumber for tool boxes, toilets, and. bprricades <br />230 g2llons gasoline 0 .151 <br />26 qts oil G 12¢ <br />Repairs to tractor <br />Operator 145 hours @ 44¢ <br />Job <br />#1 <br />62 <br />hours <br />5.45 <br />Job <br />#2 <br />15 <br />hours <br />12.66 <br />Job <br /># <br />38 <br />Hours <br />-X2.07 <br />Job <br /># <br />59 <br />hours <br />.7 <br />Job <br />#7 <br />171 <br />hours <br />1.2 <br />Job <br />#8 <br />4.2 <br />tours <br />.79 <br />Job <br />#12 <br />5 <br />hours <br />.22 <br />154 gellons gasoline @ .151 <br />14 quarts oil @ 12¢ <br />Repeias <br />Operator 1222 hours @ 44¢ <br />Job <br />#1 <br />352 <br />hours <br />34.65 <br />Job <br />#2 <br />5 <br />hours <br />4.50 <br />Job <br />#3 <br />21 <br />hours <br />15.90 <br />Job <br />#6 <br />58 <br />hours <br />52.20 <br />5 gallons gesoline @ .151 <br />2 ; quarts oil- @320 <br />Operator 8 hours @440 <br />Job #6 8 hours <br />2 m6n 440 hours *44o <br />60 new bombs purchased <br />1465 gallons kerosene @8¢ <br />1 case matches <br />233 P-,211ons gasoline @ .151 <br />27 quarts oil @ 12¢ <br />Truch repair <br />4.52 <br />PLOWING EXPENSE <br />$34.75 <br />3.12 <br />20 . ._33 �� 58�2 <br />6 - <br />122.47 <br />3.72 <br />6.02 <br />3.17 <br />16.71 <br />9.45 <br />7.63 <br />1.50 <br />1.08 <br />1 .50 <br />5.00 <br />1 <br />177.1 <br />6i,3- 05.45 <br />Cost per hour 54 4/10 cents <br />GRADING EXPENSE <br />$27.75 <br />1.60, <br />27.63 <br />53.90 <br />110.99 <br />Cost per hour 90¢ <br />ROLLER EXPENSE <br />LIGHTING EXPENSE <br />.24 <br />4. 52 <br />$193.6o <br />90.00 <br />117.20 <br />7.00 <br />35.15 <br />3.24 <br />1.46 <br />447.69 <br />0 <br />I*] <br />■ <br />10:1 <br />PAYROLL EXPENSE <br />This expense was incurred due to the necessity of the ci.ttT furnishing labor on the various- ',pro- <br />jects in order to expediate them. Supervision and labor was furnished to assist in the construc <br />tion of manholes, catch basins, and dreins, '1sb:to1-1haul cinders, gravel, end rock to the various <br />jubs. A bl?cksmith is kept busy constantly reppiring tools damaged on the sundry projects. This <br />item does not include labor furnished in the operation of the grader, plow, or roller none the <br />Labor of settin-v out danger lights. <br />Tomlinson, foreman 8 days @ 4.40 35.20 <br />Scott, foremen 7 days @ 4.40 30 <br />.00 66.00 <br />Smith, driver 103 hours <br />Kwesneski, driver 17 " <br />Jennings, driver 106 " <br />Lake, driver 24 " <br />Seiler, driver 58 <br />Grant, driver 100 <br />Shaw, driver 4 " • <br />Dierdorf, driver 41 " <br />Laszlo, driver 4 11 <br />DeVos, driver 16, " <br />Kindel, driver 9 " <br />Rose, driver it <br />Vernon, driver if <br />Sokol, driver 4 <br />