My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08062026 BPW Agenda Review Meeting - Final
sbend
>
Public
>
Public Works
>
Agendas
>
2026
>
08062026 BPW Agenda Review Meeting - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 9:27:37 AM
Creation date
8/5/2026 9:27:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Agendas
Document Date
8/4/2026
Text box
ID:
1
Creator:
Created:
8/5/2026 9:27 AM
Modified:
8/5/2026 9:27 AM
Text:
https://tinyurl.com/2025-2026BPWAgendaReview
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />AGENDA REVIEW SESSION <br />AUGUST 6, 2026 – 10:30 a.m. <br /> <br />Virtual Meeting Link https://tinyurl.com/2025-2026BPWAgendaReview <br />215 S. Dr. Martin Luther King Jr. Blvd., Training Room, 4th Floor, South Bend IN 46601 <br /> <br /> <br /> ELIZABETH A. MARADIK JOSEPH R. MOLNAR MURRAY L. MILLER BREANA N. MICOU ABIGAIL E. MAGAS Appointed 4/14/2015 Appointed 1/8/2020 Appointed 3/26/2021 Appointed 11/21/2023 Appointed 1/6/2026 <br /> <br /> Each Board of Public Works Member is appointed by the Mayor for an indefinite term Page 5 <br /> <br /> <br />4. Event: Farmer’s Market Car Show <br />a) Date/Times: August 29, 2026/10:00 a.m. to 2:00 p.m. <br />b) Location: Beyer Ave. between Mishawaka Ave. to Northside Blvd. <br />c) Favorable Recommendations <br />5. Event: 2026 NNN Arts Cafe <br />a) Date/Times: October 11, 2026/12:00 p.m. to 6:00p.m. <br />b) Location: California Ave. between Sherman Ave. and Portage Ave. <br />c) Favorable Recommendations <br />d) Favorable Recommendations/See Comments <br /> <br />13. CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO REMONSTRATE <br />A. 53170 Grassy Knoll Dr. – Water/Sewer <br /> <br />14. RATIFY BONDS <br />A. Contractor Bonds <br />1. Firm Foundation Concrete, Approved effective July 17, 2026 <br />2. Stanton Construction, Released effective July 24, 2026 <br />B. Excavation Bonds <br />1. Hoosierland Excavating, Inc. DBA Hoosierland Electrical Services, <br />Approved effective July 22, 2026 <br />2. Ancon Construction Co., Inc., Approved effective July 24, 2026 <br />3. Dotlich Trucking and Excavating, Inc., Approved effective July 27, 2026 <br />4. Capstone Building and Remodeling LLC, Released effective September <br />1, 2026 <br />5. American Mechanical LLC, Approved effective July 28, 2026 <br />C. Occupancy Bonds <br />1. NextGen Earthworks LLC, Released effective August 19, 2026 <br />2. Hoosierland Excavating, Inc. DBA Hoosierland Electrical Services, <br />Approved July 22, 2026 <br />3. Dotlich Trucking and Excavating, Inc., Approved effective July 27, 2026 <br />4. Firm Foundation Concrete, Approved effective July 16, 2026 <br />5. American Mechanical LLC, Approved effective July 28, 2026 <br />6. Profit Concrete Leveling LLC, Approved effective August 3, 2026 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.