Laserfiche WebLink
APPENDIX A <br />WORK PLAN <br />PROJECT SCOPE <br />City of South Bend <br />Proposal for Engineering Services <br />Hill Street Improvements <br />June 20, 2013 <br />Page 2 of 4 <br />The proposed project consists of replacing sections of curbs and sidewalks on Hill Street <br />between Crescent Avenue and Corby Boulevard, and constructing a new paved alley, <br />approximately 1,000 feet, parallel to Hill Street on the west side with two approaches on Hill <br />Street and one approach on Corby Boulevard. In addition, the vacated Kalorama Street <br />approach shall be removed and new sewer /water services designed for the new residential <br />lot created from the street vacation. We will incorporate our platting efforts previously <br />performed for South Bend Heritage Foundation to help reduce research and setup time. It is <br />our understanding that Tax Increment Financing (TIF) dollars will fund the project; therefore, the <br />project will either be bid or quoted through the City process. <br />SCOPE OF SERVICES <br />Based upon our understanding of the project goals and objectives, we propose to perform the <br />following services to assist the City with completing this community enhancement project: <br />Task #1: Field Survey <br />This task includes performing a topographic survey of the proposed project to determine the <br />location of existing features (sidewalks, curbs, pavement, manholes, inlets, visible utilities, etc.), <br />and to gather surface elevations of the alley right -of -way for new pavement. Prior to starting <br />the field survey, utility locates will be requested through Indiana 811 and utility maps will be <br />requested from the various utility companies. <br />Task #2: Engineering Design <br />This task includes preparing construction documents for the proposed project. We anticipate <br />these documents to include the City's standard cover sheet, maintenance of traffic if needed, <br />plan /profile sheets, construction details, and sewer /water details for the new residential lot. <br />This task also includes preparing the complete bid package consisting of special provisions, <br />front end requirements, calculating project quantities, bid proposal, and developing an <br />estimate of construction costs. We anticipate meeting with the City to kick -off the project, <br />and to review preliminary and final documents. After any revisions are made, a final set of <br />construction bid documents shall be submitted to the City. We anticipate working directly <br />with the City on setting the project schedule and advertisement dates. <br />