Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Addendum Nu. 2 <br />Project Name: Madison Street Trail Connector <br />Project Number: 125-031 <br />For Bids Due: March 10, 2026 <br />Contractor Name: PREMIUM CONCRETE SERVICES <br />Base Bid <br />u V rrr OF <br />IM65 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Mobilization/Demobilization <br />1 <br />LS <br />60,000.00 <br />60,000.00 <br />2. <br />Maintenance of Traffic <br />1 <br />LS <br />23,500.00 <br />1 23,500.00 <br />3. <br />Erosion Control <br />1 <br />LS <br />7,500,00 <br />7,500.00 <br />4. <br />Clearing Right of Way <br />1 <br />LS <br />6,000.00 <br />6,000.00 <br />5. <br />Common Excavation <br />180 <br />CYD <br />96.00 <br />17,280.00 <br />6, <br />Sign, Remove <br />8 <br />EA <br />160.00 <br />1,280.00 <br />7. <br />Sign, Relocate <br />5 <br />EA <br />180.00 <br />900.00 <br />8. <br />Light Pale, Remove <br />11 <br />EA <br />685.00 <br />7,535.00 <br />9. <br />Light Pale, Remove and Salvage <br />16 <br />EA <br />900.00 <br />14,400.00 <br />lo. <br />Pipe, Remove <br />95 <br />LFT <br />80,00 <br />7,600.00 <br />11. <br />Structure, Remove <br />7 <br />EA <br />2,700.00 <br />18,900.00 <br />12. <br />Concrete Curb, Remove <br />920 <br />LFT <br />25,00 <br />23,000.00 <br />13. <br />Concrete Approaches and Sidewalk. Remove <br />545 <br />SYD <br />32.00 <br />17 440.00 <br />14. <br />Concrete Pavement, Remove <br />535 <br />SYD <br />38.00 <br />20,330.00 <br />15. <br />Brick, Remove <br />425 <br />SYD <br />38.00 <br />16,150.00 <br />16. <br />Asphalt Milling <br />570 <br />SYD <br />20.00 <br />11,400.00 <br />17, <br />Compacted Aggregate, No. 53 <br />240 <br />TON <br />125.00 <br />30,000,00 <br />18. <br />HMA Surface <br />55 <br />TON <br />355.00 <br />19,525.00 <br />19. <br />PCCP, 8" <br />360 <br />SYD <br />132.00 <br />47,520.00 <br />20. <br />PCCP, Colored, 8" <br />30 <br />SYD <br />260.00 <br />7,800.00 <br />21. <br />PCCP for Approaches, 8" <br />80 <br />SYD <br />180.00 <br />14,440.00 <br />22. <br />D-1 Contraction Joint <br />90 <br />LFT <br />50.00 <br />4,500.00 <br />23. <br />Brick Paver Reset <br />245 <br />SYD <br />232.00 <br />56,840.00 <br />24. <br />Concrete Curb <br />1,070 <br />LFT <br />56.00 <br />59,920.00 <br />25. <br />Concrete Sidewalk, 4" <br />810 <br />SYD <br />95.00 <br />76,950.00 <br />26. <br />Concrete Sidewalk, 5" <br />90 <br />SYD <br />110.00 <br />9,900.00 <br />27. <br />Concrete Curb Ramp <br />70 <br />SYD <br />260.00 <br />18,200.00 <br />28. <br />Detectable Warning Surface <br />15 <br />SYD <br />260.00 <br />3,900.00 <br />29. <br />Sodding <br />1,400 <br />SYD <br />30.00 <br />42,000.00 <br />30. <br />Street Tree <br />26 <br />EA <br />1,130.00 <br />29, 380.00 <br />31. <br />Shrub <br />30 <br />EA <br />148.00 <br />4,440.00 <br />32. <br />Storm Sewer Manhole <br />2 <br />EA 18,100.00 <br />16,200.00 <br />33, <br />Storm Sewer Catch Basin <br />7 <br />EA <br />7,500.00 152,500.00 <br />34. <br />Storm Sewer Pipe, 12" <br />220 <br />LFT <br />220.00 <br />12,825.00 <br />48,400.00 <br />35. <br />Adjust Valve to Grade <br />5 <br />EA <br />565.00 <br />Version 5/20/2024 Contractor's Bid for Public Works - 7 <br />