Morris Parking Garage - CMc RFP Response • Shiel Sexton | 7
<br />NON-COLLUSION FORM
<br />James’ responsibilities include supervision of the construction team, securing subcontracts,
<br />purchasing, monthly invoicing, subcontractor payments, weekly progress meetings as well as
<br />ensuring quality, production, and safety throughout the construction process. James oversees
<br />total construction efforts, providing administrative and technical direction, to ensure each project
<br />is constructed in accordance with design, budget, and schedule specifications.
<br />JAMES LETSINGER PROJECT MANAGER
<br />Baumer Hall
<br />University of Notre Dame
<br />Research Building
<br />PROJECT EXPERIENCE
<br />University of Notre Dame McCourtney Hall
<br />Research Complex Phase 1 (Notre Dame, IN):
<br />$76.4 million concrete cast-in-place research
<br />complex including a 200,000 SF laboratory
<br />building and a 2,300 linear foot underground
<br />utility tunnel.
<br />University of Notre Dame Research Building
<br />II (Notre Dame, IN): $109.5 million, 200,000
<br />SF concrete cast-in-place educational
<br />facility consisting of 110,000 SF of office and
<br />laboratory space.
<br />University of Notre Dame Jack and Kathy
<br />Shields Family Hall (Notre Dame, IN): A
<br />150,000 SF building will offer best-in-class
<br />sports amenities focused on performance
<br />advancements and physical conditioning.
<br />University of Notre Dame Baumer Hall (Notre
<br />Dame, IN): New construction of a $23.9 million
<br />residence hall totaling in 80,000 SF with
<br />amenities such as chapels, study areas, and a
<br />workout facility.
<br />Purdue University Engineering & Polytechnic
<br />Gateway Building (West Lafayette, IN):
<br />Concrete cast-in-place instructional space and
<br />teaching labs, design studios, collaborative
<br />spaces and administrative offices.
<br />FIRM BACKGROUND, TEAM, & EXPERIENCE
<br />Joe is responsible for all onsite management and supervision, technical management, scheduling,
<br />subcontractor coordination, guidance of daily work forces, and maintenance of levels of jobsite
<br />efficiency. Joe is also responsible for the implementation of both federal and state OSHA
<br />regulations on the jobsite and enforcement of jobsite safety procedures in accordance with the
<br />safety coordinator and company policy.
<br />JOE AGRESTA SUPERINTENDENT
<br />Bottleworks District
<br />PROJECT EXPERIENCE
<br />Ironworks at Keystone Village (Indianapolis,
<br />IN): A $30 million mixed-use development that
<br />includes the new construction of a five-story
<br />structure with first floor retail, apartments, and
<br />structure and surface parking.
<br />Bottleworks District (Indianapolis, IN):
<br />Redevelopment of the entertainment district
<br />includes new construction of five buildings
<br />and several interior build-outs. The structures
<br />consist of retail and office space, a parking
<br />garage, cinema build-out, and food hall.
<br />DePauw University Bottoms Alumni and
<br />Development Center (Greencastle, IN): $9.1
<br />million complete renovation of a former sorority
<br />house into an Alumni and Development
<br />Center. The 22,742 SF project also consists
<br />of a new two-story addition and extensive site
<br />improvements.
<br />Purdue University Academic Success Building
<br />(Indianapolis, IN): The Academic and Student
<br />Success building will be a stunning $175
<br />million, 258,000 SF academic and student
<br />housing facility, raising 16 stories in the
<br />skyline.The building aims to gain a LEED Silver
<br />certification.Ironworks at Keystone Village
|