My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - Garmong
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - Garmong
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:42:35 PM
Creation date
3/10/2026 2:42:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8Morris Performing Arts Center Parking Garage <br />Garmong Construction <br />Terre Haute Convention Center | Terre Haute, IN <br />Garmong served as Construction Manager for the 41,000 square-foot Terre Haute <br />Convention Center. Located in the downtown area, the facility is largely single- <br />story with a main ballroom, which accommodates up to 900 people, and a full- <br />service kitchen area. The structure also includes a two-story section that houses the <br />Larry Bird Museum on the first floor and administrative areas on the second floor. <br />Garmong also constructed a five-level, pre-cast parking garage to accommodate <br />the Convention Center. <br />Project Cost: $25,000,000 <br />Reference: Tennille Wanner | 812.244.1559 <br />Challenges and Successes: Before construction could begin, extensive utility <br />relocations were necessary due to the need for deep foundations. This added <br />complexity to the early phases of the project and required close collaboration with <br />utility providers and city officials. <br />Monon on Main Parking Garage | Carmel, IN <br />Garmong served as Construction Manager for this $20M mixed-use development <br />project in downtown Carmel. The three-story, 12,000 square-foot building features <br />an upscale steakhouse; a three-story office building with 17,600 square-feet of <br />office space and 8,000 square-feet of ground level retail space along Main Street; <br />seven townhouses, a park along the Monon Trail and a parking garage. The project <br />is located at the intersection of Main Street and the Monon Trail. <br />Project Cost: $20,000,000 <br />Reference: Chuck Lazzara | 317.846.9158 <br />Challenges and Successes: The project involved redeveloping an entire city block <br />in downtown Carmel, requiring careful coordination with both a private developer <br />and the City of Carmel. <br />Midtown East Parking Garages | Carmel, IN <br />Garmong completed two independent parking structures as part of the Midtown <br />East commercial and residential development. These parking structures were <br />constructed concurrently with adjacent multi-story commercial buildings that were <br />not completed by Garmong. Our team helped the owner coordinate the design <br />and construction of the structures with multiple stakeholders, including city officials, <br />private developers, the public, and owners of adjacent buildings. <br />Project Cost: $16,100,000 <br />Reference: Henry Mestetsky | 317.571.2492 <br />Challenges and Successes: The south parking garage included the installation <br />of a subsurface rainwater collection tank to serve the area’s development, adding <br />complexity to the construction process and requiring careful coordination with site <br />utilities and environmental requirements..
The URL can be used to link to this page
Your browser does not support the video tag.