My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:42:24 PM
Creation date
3/10/2026 2:42:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16MORRIS PARKING GARAGE | PROJECT #125-065 <br />INDIANAPOLIS ANIMAL CARE SERVICES <br />INDIANAPOLIS DEPARTMENT OF BUSINESS AND NEIGHBORHOOD SERVICES | INDIANAPOLIS, IN <br />The new Indianapolis Animal Care Services offers much needed resources for our <br />animals with administrative offices, detached barn, and outdoor space. This new <br />shelter will be approximately 70,500 SF with an additional 7,025 SF under roof for <br />the indoor/outdoor kennels. The building will accommodate Cat Adoption, Dog <br />Adoption, Training, Vet Services, Surrender, Enforcements, Administration, kennels, <br />and Building Services with additional outdoor areas for a Public Dog Park, Adoption <br />Center Play Area, and other support areas. It will be constructed on a portion of <br />a 24-acre parcel currently being transferred to the City of Indianapolis. Exterior <br />construction type is expected to be precast panel 70% of the building and the <br />remaining exterior wall construction is conventional steel frame with metal stud. <br />CONTRACT METHOD <br />Construction Manager as Constructor <br />(CMc) <br />PROJECT SIZE <br />70,500 SF <br />CONSTRUCTION COST <br />Confidential <br />COMPLETION DATE <br />October 2025 <br />PROJECT SIMILARITIES <br />Public CMc Delivery <br />3. FIRM BACKGROUND/TEAM/EXPERIENCE <br />CHALLENGES: <br />• Animal Health Design Requirements <br />• Indoor/Outdoor Integration <br />• Large Site Development <br />• Hybrid Structural Systems <br />• Accelerated Schedule <br />SUCCESSES: <br />• Expanded Community Resource <br />• Improved Animal Welfare <br />Environment <br />• Completed On-Time <br />• Enhanced Site Development
The URL can be used to link to this page
Your browser does not support the video tag.