My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2026
>
Opening of Quotations/Proposals/Qualifications
>
Opening of Proposals - Main St Housing Parking Garage Proj No 125-065 - FA Wilhem
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 2:42:24 PM
Creation date
3/10/2026 2:42:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
13MORRIS PARKING GARAGE | PROJECT #125-065 <br />3. FIRM BACKGROUND/TEAM/EXPERIENCE <br />FIRM EXPERIENCE <br />CONTRACT METHOD <br />Design-Build <br />PROJECT SIZE <br />101,593 SF <br />CONSTRUCTION COST <br />$8,500,000 <br />COMPLETION DATE <br />July 2022 <br />PROJECT SIMILARITIES <br />Parking Garage <br />Wilhelm served as the Design-Build Manager constructing a cast-in-place, post-ten- <br />sioned parking garage with a brick facade. Standing three floors and covering <br />102,000 SF, the garage accommodates 303 parking spaces. Additional scope <br />included the design and fitting of 50 electric vehicle chargers, a solar canopy, and <br />an elevator. <br />The project also included an aqua swirl, a water quality unit designed to remove <br />solids and prevent contamination from entering the sewer system. <br />CARMEL CIVIC SQUARE GARAGE <br />CITY OF CARMEL | CARMEL, IN <br />CHALLENGES: <br />• Aggressive Schedule <br />• Post-Pandemic Supply Chain <br />• GMP Requirements <br />• High Architectural Standards <br />• Future Integration Requirements <br />SUCCESSES: <br />• Strategic Design-Build Delivery <br />• In-House Design Leadership <br />• Material Strategy Pivot <br />• Enhanced Architectural Value <br />• Self-Perform Capabilities <br />• Successful Public Facility Delivery
The URL can be used to link to this page
Your browser does not support the video tag.