Laserfiche WebLink
13MORRIS PARKING GARAGE | PROJECT #125-065 <br />3. FIRM BACKGROUND/TEAM/EXPERIENCE <br />FIRM EXPERIENCE <br />CONTRACT METHOD <br />Design-Build <br />PROJECT SIZE <br />101,593 SF <br />CONSTRUCTION COST <br />$8,500,000 <br />COMPLETION DATE <br />July 2022 <br />PROJECT SIMILARITIES <br />Parking Garage <br />Wilhelm served as the Design-Build Manager constructing a cast-in-place, post-ten- <br />sioned parking garage with a brick facade. Standing three floors and covering <br />102,000 SF, the garage accommodates 303 parking spaces. Additional scope <br />included the design and fitting of 50 electric vehicle chargers, a solar canopy, and <br />an elevator. <br />The project also included an aqua swirl, a water quality unit designed to remove <br />solids and prevent contamination from entering the sewer system. <br />CARMEL CIVIC SQUARE GARAGE <br />CITY OF CARMEL | CARMEL, IN <br />CHALLENGES: <br />• Aggressive Schedule <br />• Post-Pandemic Supply Chain <br />• GMP Requirements <br />• High Architectural Standards <br />• Future Integration Requirements <br />SUCCESSES: <br />• Strategic Design-Build Delivery <br />• In-House Design Leadership <br />• Material Strategy Pivot <br />• Enhanced Architectural Value <br />• Self-Perform Capabilities <br />• Successful Public Facility Delivery