Laserfiche WebLink
11MORRIS PARKING GARAGE | PROJECT #125-065 <br />DOUG MIRR <br />SAFETY COORDINATOR <br />• Manage the site safety program <br />• Manage the coordination of jobsite safety with trade/sub contractors <br />• Manage the monitoring and enforcing of compliance with applicable safety <br />regulations and programs <br />• Manage the recording or compiling of all required documents on accident reports, <br />investigations, or any violations <br />PROJECT EXPERIENCEYEARS OF EXPERIENCE <br />22 <br />EDUCATION <br />A.S., Business Administration, <br />Indiana University <br />TRAINING/ <br />CERTIFICATION <br />OSHA 510 and OSHA 500, 502 <br />Train the Trainer <br />FEMA certified Hazardous commu- <br />nication training/ Hazmat. <br />DOT 181 HM material handling and <br />packaging certification <br />Confined Space and scaffolding <br />certified <br />Industrial Hygiene Air monitoring, <br />sampling, and documenting for <br />Lead and Asbestos Abatement <br />Engineering of mechanical ven- <br />tilation of confined spaces and <br />environmental analysis <br />Certified Environment Specialist <br />Excavation and Trench suspended <br />scaffolding Certified Competent <br />Person <br />OSHA horizontal 29 CRF1910 and <br />vertical 29 CRF 1926 background <br />and competency <br />Red Cross First Aid/ CPR/AED train- <br />ing and Blood Borne Pathogens <br />certification <br />Certificate in Occupational Health <br />& Safety, Columbia Southern Uni- <br />versity <br />Madison Lifestyle District Parking Garage <br />City of South Bend | South Bend, IN <br />This project consists of construction management services for a new parking garage in <br />downtown South Bend as part of the Madison Lifestyle District development. The garage <br />supports the surrounding mixed-use development, including a hotel and apartment <br />buildings constructed by CRG, and is integrated into the overall urban site plan. <br />Riverfront at Promenade Park <br />Barrett and Stokely | Fort Wayne, IN <br />Currently under construction is the Riverfront at Promenade Park which is a mixed-use <br />project that builds off the momentum of the City of Fort Wayne’s riverfront development. <br />This development provides nearly 230 residential apartments, a 900-car parking garage, <br />office, and retail space along the St. Mary’s River directly across the street from the city’s <br />newest riverfront park, Promenade Park. There is approximately 30,000 SF of office <br />space and nearly 15,000 SF of retail space. The garage was turned over for occupancy in <br />January of 2022 and the apartments and commercial space are expected to be complete <br />in early 2023. Wilhelm is the GC for this project and self-performing the concrete and <br />masonry packages. <br />Condiment Manufacturing and Packaging Facility <br />Confidential Food Processing Client | South Bend, IN <br />This project involves the expansion of a Food grade production facility of 15,000 SF, <br />for the making and retrofit of an existing warehouse to house the packaging line. <br />Also included are modifications to site infrastructure, a New Building Processing Area <br />including Tank Farm, Making Area, Non-processing areas including Raw, Intermediate <br />and Finished Product Warehouse, shipping and receiving dock doors, office and shared <br />space. <br />PREVIOUS EXPERIENCE <br />Thomson Hydro Dam and Power <br />Thomson, MN <br />Renovation and refurbishing of 120-megawatt Hydroelectric Plant <br />Built in 1907, 90-million-dollar renovation on 2 miles of underground Penstock piping, 4 <br />Turbines, Electric Plant facility, Dams and gates after an historic 150-year flood. Over saw <br />the confined space, lead abatement, and health and safety of the renovation. <br />3. FIRM BACKGROUND/TEAM/EXPERIENCE <br />CMc <br />CMc <br />CMc